ABANDONED! PLEASE GO HERE:
Projects By Area
Exterior
Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. Check with Tom Gralewicz for positioning. We have the tools and bolts at the space.
Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving.
Paint exterior door frames where the new doors were installed. Caulk when done.
Finish the exterior south east entrance (vault hall). The ceiling panels door need to be caulked and painted.
Alley lights
Switch plate next to the Otjen entrance
Access control system at Vault entrance - Royce P.
Paint new brick work outside the building
Repair broken bricks around the outside of the building.
Entrance Area
Pin ball machine repairs, a never ending project: replace broken flipper.
Humorously oversized games. Giant Yatzee/Jacks/Scrabble/Craps
Laser Kaleidoscope
BADASS 2.0
Giant Makey-Makey Piano Keyboard
MAME Cabinet
Craft Area
Chem Lab
Build the chem lab floor - it needs a raised floor so we can run drains and put a sink anywhere in the room and a sink in the dark room
Install a sink in the chem lab
Duct part of the vent fan in the chem lab to above the spray nook.
Dark Room
Laser Cutter Area
Fix the 25W laser - find out if its the tube or the power supply.
Move the exhaust fan for the laser cutters and duct it.
Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router.
3D Printer Area
Project | Maker |
Side shields for MakerBot printer.
- Print mounting pieces for side shields.
- Laser cut side shields.
- Assemble and mount. | Your name here |
Electronics Area
Meeting Area
Kitchen
East Room
SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.
Permanent charging station for the fork lift.
Outlets on the columns in the East room
Replace the light socket on the vertical band saw.
Power up the 3 headed drill press (with only 2 heads left.
Find/make chuck jaws for the South Bend lathe, or mount a chuck that has both sets of jaws.
Metal storage (vertical storage of bar stock along a wall is organized and space efficient)
West Room Work Area
Wood Shop
Project | Maker |
Power the dust collector in the wood shop | Tom Gralewicz |
Add more tool pegboard in the wood shop
and move wood shop tools and half of the duplicate tools
from the main pegboard. | Jim Rawson |
Wood storage - build some shelves or something | |
Organize the wood scrap/stock, make a rack or bin for it | |
Welding Shop / Smithy / Casting
Come up with scrap metal bins to hold small pieces so they don't spill everywhere.
Gas line for the forge and furnace. -Dan J.
Mount a good grinder in the welding are for sharpening TIG electrodes.
Fix the louvers on the weld shop fan so they close correctly.
Build Auxiliary hammer / forging tool rack. - Dan J.
Mount small forge in permanent home. - Bill^2 and Dan J.
Alley Entrance Area
Vault Hallway
Paint Room
Multiple Areas
Install the doors with windows: 2 in the south wall of the electronics lab and one between the east room and vestibule.
PA system/phones - Chris H.
Wash the carpet - try to get out some of the water stains.
East and West room lighting automation system - Vishal/Chris H.
Stripe the exit aisles - add some diagonal stripes so people know what part is aisle.
Hang speakers and wire sound system - Kevin B.
Replace steel floor plates with holes in them and reinforce them so they won't bend if the fork lift drives over them.
Projects Done
Build shelving for mold boxes. -Dan J.
Build Stock rack for forging material. -Bill M. and Dan J.
Install Air Lines - Joe R. and Chris H.
Tool pegboard. Make something to hold pliers and Allen keys better. - Jim Rawson