====== Red Dragon - Matsuura RA1F - Vertical Machining Center ====== | ====== Red Dragon - Matsuura RA1F - Vertical Machining Center ====== | ||
~~NOTOC~~ | ~~NOTOC~~ | ||
- | {{: | + | {{: |
===== Make/Model ===== | ===== Make/Model ===== | ||
Line 8: | Line 8: | ||
| | ||
208v/ | 208v/ | ||
- | |||
- | | ||
- | Bad spindle motor | ||
| | ||
- | Metal Shop at Lenox\\ | + | Removed from the space\\ |
| | ||
Line 20: | Line 17: | ||
| | ||
8/2014 - Arrived at Lenox | 8/2014 - Arrived at Lenox | ||
+ | |||
+ | | ||
+ | |||
+ | Follow the directions in "Red Dragon Startup Procedure" | ||
+ | |||
+ | Copy your G-code to the computer connected to the Red Dragon. | ||
+ | |||
+ | Run XXXX to transfer your file to the Red Dragon | ||
+ | |||
+ | On the Red Dragon set the mode to " | ||
+ | Push the " | ||
+ | Select " | ||
+ | Enter the file number you want to use, it should start with the letter ' | ||
+ | Press " | ||
+ | |||
+ | On the PC | ||
+ | |||
+ | |||
+ | Note: If the transfer is having problems make sure parameters PM0009 thru PM0020 match the parameter file below on this page. | ||
+ | |||
+ | |||
+ | |||
| | ||
Line 39: | Line 58: | ||
< | < | ||
- | 4. Add way slide covers | + | <del>4. Add way slide covers |
+ | </ | ||
< | < | ||
- | 6. Check for safety equipment | + | <del>6. Check for safety equipment</ |
- | 7. Mount coolant pump | + | <del>7. Mount coolant pump</ |
- | 8. Connect coolant system | + | <del>8. Connect coolant system</ |
< | < | ||
Line 53: | Line 72: | ||
10. Inventory and organize spare parts | 10. Inventory and organize spare parts | ||
- | 11. Change fluids | + | <del>11. Change fluids</ |
12. Setup and repair tooling (some tools are broken but repairable) | 12. Setup and repair tooling (some tools are broken but repairable) | ||
Line 61: | Line 80: | ||
< | < | ||
</ | </ | ||
- | 15. Manuals scanned for attachment to the wiki for future reference | + | <del>15. Manuals scanned for attachment to the wiki for future reference</ |
16. See if we can add a 4th axis - I want it to cut gears! | 16. See if we can add a 4th axis - I want it to cut gears! | ||
- | 17. get some coolant mix, we are going to need a few gallons of coolant to keep the machine happy and I don't think we have enough mix at the space. | + | <del>17. get some coolant mix, we are going to need a few gallons of coolant to keep the machine happy and I don't think we have enough mix at the space.</ |
- | 18. Find a nice vice for it and get a set of hold downs that fit the work table. | + | <del>18. Find a nice vice for it and get a set of hold downs that fit the work table. |
+ | </ | ||
+ | < | ||
- | 19. Make covers for the exposed parts of the coolant/ | + | <del>20. Wire in with full power once its in its final position. |
- | + | </ | |
- | 20. Wire in with full power once its in its final position. | + | <del>21. Run more permanent pneumatic line for it. |
- | + | </ | |
- | 21. Run more permanent pneumatic line for it. | + | <del>22. Repair spindle motor</ |
- | + | ||
- | 22. Repair spindle motor | + | |
These are just some things I can think of off the top of my head, please list more tasks as you think of them. One big task will be integrating this into a workflow that can be easy for others to use. My pipe-dream is to have mach3 run it to make it more like other machines already in use at the space to reduce the learning curve as much as possible. | These are just some things I can think of off the top of my head, please list more tasks as you think of them. One big task will be integrating this into a workflow that can be easy for others to use. My pipe-dream is to have mach3 run it to make it more like other machines already in use at the space to reduce the learning curve as much as possible. | ||
Line 81: | Line 100: | ||
==== Manuals ==== | ==== Manuals ==== | ||
+ | |||
+ | Start up instructions | ||
+ | {{: | ||
Maintenance Manual | Maintenance Manual | ||
Line 99: | Line 121: | ||
Spindle FVD manual - includes testing components and setting index. | Spindle FVD manual - includes testing components and setting index. | ||
{{: | {{: | ||
+ | |||
+ | Parameter file - downloaded parameter file - working configuration | ||
+ | {{: | ||
+ | ~~BARCODE~class=barcode_right~~ | ||