User Tools

Site Tools


equipment:furnace

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
equipment:furnace [2013/02/19 13:44]
branth [Forge]
equipment:furnace [2023/01/10 05:52] (current)
darnold [Specs]
Line 1: Line 1:
-====== Casting Furnace ======+ 
 +====== #22: Crucible Furnace ======
 ~~NOTOC~~ ~~NOTOC~~
 {{ :projects:casting_furnace:photo_apr_19_10_22_11_pm.jpg?300|}} {{ :projects:casting_furnace:photo_apr_19_10_22_11_pm.jpg?300|}}
-{{ http://milwaukeemakerspace.org/wp-content/uploads/2012/12/DSC_4462-640x425.jpg}} +{{ http://milwaukeemakerspace.org/wp-content/uploads/2012/12/DSC_4462-640x425.jpg?300}} 
 +{{:equipment:equipment:casting:img_8062b.jpg?250|}}
  ===== Make/Model =====  ===== Make/Model =====
 Custom built by [[members:BretDaniel|Bret Daniel]] at Milwaukee Makerspace Custom built by [[members:BretDaniel|Bret Daniel]] at Milwaukee Makerspace
  
  =====Specs =====  =====Specs =====
-A vertical oven used to melt metals in a crucible for pouring and casting\\ +Crucible furnace - Designed to hold #16 size crucible (16lbs of Aluminum)  Aluminum takes aprrox 30-45 minutes to achieve temperature, Bronze takes a bit longer.  In terms of volume, the #16 is about the same volume/size as a human head.\\ 
-Runs on propane, waste oil, and/or diesel fuel\\+This furance is currently set up for Natural Gas, but can also use propane, waste oil, and/or diesel fuel\\
 Approximately 2200 deg F max temp\\ Approximately 2200 deg F max temp\\
 +
 +It is possible to fit a #20 crucible. Please refer to [[members:davidarnold|David Arnold]] if you would like to cast up to 20# of Aluminum or 60# of bronze.
  
  =====Current Status =====  =====Current Status =====
Line 16: Line 19:
  
  =====Location =====  =====Location =====
-Current: Casting Area, West Room, Lenox\\+Current: Casting Area, SouthEast Casting area, Norwich\\ 
 +Previuos: Casting Area, West Room, Lenox\\
 Previous: Casting Area, Vehicle Bay, Chase Previous: Casting Area, Vehicle Bay, Chase
  
Line 23: Line 27:
  
  =====History =====  =====History =====
-04/04/12 - Successful test of burner and blower fan +04/04/12 - Successful test of burner and blower fan\\ 
-09/01/12 - Furnace complete +09/01/12 - Furnace complete\\ 
-11/08/12 - First aluminum casting pour +11/08/12 - First aluminum casting pour\\ 
-12/31/12 - Moved to Lenox+12/31/12 - Moved to Lenox\\
  
  =====Notes =====   =====Notes ===== 
Line 33: Line 37:
 [[http://milwaukeemakerspace.org/tag/casting/|http://milwaukeemakerspace.org/tag/casting/]] [[http://milwaukeemakerspace.org/tag/casting/|http://milwaukeemakerspace.org/tag/casting/]]
 [[http://milwaukeemakerspace.org/2012/06/casting-furnace-update/|June 28, 2012 build update]] [[http://milwaukeemakerspace.org/2012/06/casting-furnace-update/|June 28, 2012 build update]]
 +
 +~~BARCODE~class=barcode_right~~
equipment/furnace.1361281497.txt.gz · Last modified: 2013/02/19 13:44 by branth