spaceprojs [2019/04/27 17:13] wildapricot-schneider_markus [Punch List for April 2019] |
spaceprojs [2019/05/10 21:05] kathughett |
||
---|---|---|---|
Line 9: | Line 9: | ||
===== Current To Do List ===== | ===== Current To Do List ===== | ||
- | ==== Punch List for April 2019 ==== | + | ==== Punch List for May 2019 ==== |
- First thing - Vacuum cafe area and meeting room. | - First thing - Vacuum cafe area and meeting room. | ||
- Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up. | - Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up. | ||
- Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color) | - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color) | ||
- Clean out the Toaster, Toaster Oven, and Microwave | - Clean out the Toaster, Toaster Oven, and Microwave | ||
- | - Install another 250v 30 amp outlet in the weld area by the belt grinder to be dedicated to the powder coating oven. (See Tom G.) | ||
- SUPERIMPORTANT: | - SUPERIMPORTANT: | ||
- | - __Metal Shop Microtasks__: | + | - More work needed on the compressed air dryer (See Markus or Tom G.) |
- | - Clean out clog in the compressed air dryer (See Markus or Tom G.) | + | - Revamp the Cafe area floor. (See Kyle) |
- | - Move dishware to rolling cabinets and mount shelves for small appliances. *Contingent on getting rolling islands completed for cafe.* | + | - Move bookcase |
- | - Move bookcase to library replacing smaller bookcase. | + | - Make smaller bookcases up for grabs for 1 week. |
- | - Revamp the Cafe area floor. (See Kyle) *Contingent on getting rolling islands completed | + | - Replace table in electronics area with a better one from the pallet racks. |
- | - Move smaller bookcase out to craft lab hallway | + | |
- Scrub the sinks in the mud room. | - Scrub the sinks in the mud room. | ||
- If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | ||
Line 32: | Line 30: | ||
- Replace wood shop air filters (ongoing) | - Replace wood shop air filters (ongoing) | ||
- Disseminate contents of Impound Lot IF needed. | - Disseminate contents of Impound Lot IF needed. | ||
- | - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first) | ||
- Vacuum Cafe area at the end of the day after the feast. | - Vacuum Cafe area at the end of the day after the feast. | ||
- Red ticket abandoned projects in East Room. | - Red ticket abandoned projects in East Room. | ||
- | - Paint the big First Aid cabinet in the mud room white. Cut red vinyl words and cross for the front. Coat with a clear coat to preserve the vinyl stickers. (See Kathy Hughett) | + | - Paint the lettering on the big First Aid cabinet in the mud room RED. (Kathy Hughett) |
- check paper towel stock | - check paper towel stock | ||
- | - finish cabinets | ||
- sort through tall storage | - sort through tall storage | ||
- | - make sure parking ticket holders are sufficently | + | - make sure parking ticket holders are sufficiently |
- clean out vacuum cleaner filters | - clean out vacuum cleaner filters | ||
- | - replace damaged or bad looking drop ceiling tiles | + | - Finish |
- | - Milwaukee | + | - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first) |
- | - Install extra outlet by gorton | + | |
- | - install light pull chain light switches in the digital productions | + | |
===== Standing To-Do/ | ===== Standing To-Do/ |