This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
spaceprojs [2019/03/26 23:14] kathughett |
spaceprojs [2019/03/28 18:04] wildapricot-schneider_markus [Punch List for March 2019] |
||
---|---|---|---|
Line 27: | Line 27: | ||
- Double check to see if the clocks were updated | - Double check to see if the clocks were updated | ||
- Rearrange space in Machine shop to make room for the new Tormach. | - Rearrange space in Machine shop to make room for the new Tormach. | ||
+ | - Anchor the crane in the metal shop. (5/8 wedge anchors at least 2-3/4 deep. see Markus) | ||
- Scrub the sinks in the mud room. | - Scrub the sinks in the mud room. | ||
- | - Add 8 additional lights to the metal shop. They need to be wired in. See Tom K. for instructions. | ||
- See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | ||
- Organize the paint room shelves. Dust off cans. | - Organize the paint room shelves. Dust off cans. |