  1. - Design and build a cabinet for storing safety goggles. - <del>- Install a longer hose for the water cooler. - <del>- Shift over the fridges into their permanent position.(Many guys did this.) - <del>- LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (completed by Sallie & Kevin Draper, Tony W., & Markus ) - <del>- TOP PRIORITY - Finish painting the wall and installing the flooring in the Cafe Area - <del>- FIX LIGHT FIXTURE IN CERAMICS VAULT Jeff M. did it
  2. - Add Electrical outlet in the cafe area. Mike Tarnowski
  3. - Design and build a bigger, better vault key box for the server room. Completed by Markus.
  4. - Paint the lettering on the big First Aid cabinet in the mud room RED. (Kathy Hughett)
  5. - Clean graffiti off of external East Wall. We were notified by Neighborhood services on 3/27/2019. Graffiti was removed by Neighborhood Services
  6. - Rearrange space in Metal shop to make room for the new Tormach.
  7. - Access control system at Vault entrance - Dan J.
  8. - Install handle on exterior door of vault hallway.
  9. - Organize the paint room shelves. Dust off cans. Done by Marie Gentil.
  10. - Anchor the crane in the metal shop. (5/8 wedge anchors at least 2-3/4 deep. see Markus)
  11. - Clean and repair new used grill. (Done by Dan Luglio)
  12. - Move Punch Press to leather working Area.
  13. - Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus.
  14. - Build a large rolling island with cabinets below for storage (Tom Gondek)
  15. - Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind.
  16. Cut off the ends sticking out from the gray rolling stairs. (see Markus)
  17. Reinforce Tall storage. The storage needs to be emptied then see Markus
  18. Check and fix/get a new toilet seat for the far mens room toilet see Tony W.
  19. Install suspended electrical hookup above craft lab table. (Colleen and Markus)
  20. Tear apart green particle board cart in front of pallet racks that used to belong to Marc Ownley.
  21. Remove fluorescent lights in vault hallway in spaces VA103 & VA104. (brought in by Matt Melk).
  22. Build a box for Charcoal filters for the laser cutter exhaust system.Completed by Markus, Tony W., Brant
  23. Replace the ceiling tiles in the vault hallway Tom G.
  24. Signage for tall storage. Kathy H.
  25. The Tall storage needs to be gone through and the items with expired parking permits beyond two weeks time need to be moved to the impound lot.(Wolfgang and Alex G.)
  26. Put long folding tables on cart on top of pallet racks on south end. Power wheels car with horse needs to get moved to a single open spot.
  27. Sort and recycle metals No one to help and gaylord became dumping place for e-waste
  28. Install wiring for new kiln in ceramics area. Tom G., Shane, Tony, Jeff
  29. INSTALL PRESSBAR ON SOUTHWEST DOOR to disable unlocking mechanism. Whoever does this gets to be first in line for food. This was done by Billy and Tom K.
  30. Clean Up and organize the Cafe' shelves after March SID. Heidi Z. & Colleen L.
  31. Paint Room Demo & Redo (Brant H. & Tom Gr.)
  32. Put edging around large table in Craft Lab. (Colleen)
  33. Complete the plumbing for sink in men's room.Do we need a professional plumber(Wolfgang did the spackling, Kyle installed the sink, unsure of who did the plumbing.)
  34. Complete new storage plan. Finished by David Draeger and a team of members
  35. Outlet for the pinball machine and door bell - get rid of the extension cords Tom G.
  36. Install new Wood shop dust collection system. (Done in 2017)
  37. Remove the old buckets of Silk screening paint. Tony & Kyle did this.
  38. Clean and organize top shelf of hardware bins in Metal Shop.(Started by Rik S.)
  39. Network cables run to New 3D Lab (Completed by Tony W., Marcin, Mark, Eric)
  40. 3D Printing moves to Willies old boat area.
  41. Black Shelves from Ladies coat room goes into old 3D area.
  42. White shelves from Cooties room go into Ladies coat room.
  43. Cosplay Group moves into former Cooties room.
  44. Batteries replaced in vault hallway thermostat (Steve Pilon 11/11/17)
  45. Install awnings over the outside doors. (Rik Stardy, Marcin Polewski, Steffanie Maher, and Dan Jonke. Completed 11/5/2017
  46. Replace Batteries in some of the clocks
  47. Projection system needs a new VGA HDMI
  48. Clear out open area in East Room for Maker Faire projects
  49. Get Impound lot ready for raffle in July. (Photos & numbers)
  50. Install an automatic drain on the big tank.- See Tom G .
  51. Install new water cooler- Timothy Campbell did this!
  52. Permanent charging station for the forklift.
  53. Replace gasket/diaphragm in the self-filling water cooler
  54. Come up with scrap metal bins to hold small pieces so they don't spill everywhere.
  55. Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws.
  56. Mount a good grinder in the welding area for sharpening TIG electrodes.
  57. Pinball machine repairs, a never ending project
  58. Mount 911 phones by exit doors - See Adrian
  59. Remove manual lock/unlock from alley doors
  60. Fix numeric pad on Door 1 - Royce did this!
  61. Level CNC plasma table - Marc and helpers did this!
  62. Install new pallet racking for member storage shelves - Lots of people helped with this
  63. Make “Park on SAME/OPPOSITE” signs for posting outside on meeting nights - Keith did this
  64. FIX FLASHING - Rick did this!
  65. Check on auto-filling water cooler leak
  66. Remove large format printer
  67. Reorganize the area around the vacuum former, to allow it to be used
  68. Mount the cork board by the desk in the lobby
  69. Some attention should be paid to the small sand blaster window, to see if we can make it more usable
  70. Power column for the conference table in the meeting room - See Tom G. and Adrian V.
  71. SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.
  72. Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router.
  73. Do something with the VLAT.
  74. Remove the old heater above the back hall from the craft shop so we can hang new lights
  75. Hang new lights in the craft shop hall.
  76. Move the exhaust fan for the laser cutters and duct it.
  77. Gas line for the forge and furnace - Tom, Dan J.
  78. Outlets on the columns in the East room - Tom
  79. Paint exterior door frames where the new doors were installed. Caulk when done. - Dan J., ?
  80. Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. - Ed, ?
  81. Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving. - Made redundant by bollard installation.
  82. Hang speakers in West Room - Kevin B., Dan J.
  83. Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard. - Vishal, ChrisH, JimR, others
  84. Power the dust collector in the wood shop - Tom G
  85. Install Air Lines - Joe R. and Chris H.
  86. Clean out Vault 1 and make rentable - Tiffany, Sean
  87. Organize plotters and screen printing and pottery areas - SteveP, Brant, Pete, DL, others
  88. Move shelving into vault hallway - Tiffany, Sean, Brant, etc.
  89. Find a home for the bar - Meh, good enough for now
  90. Hang mirror over wash sink - Brant
  91. Replace the light socket on the vertical band saw.
  92. Fix the 25W laser - find out if its the tube or the power supply.
  93. Power up the 3 headed drill press (only 2 heads left)
  94. Tool pegboard - make something to hold pliers and Allen keys better.
  95. Wash the carpet - try to get out some of the water stains.
  96. PA system/phones - Chris H. (done)
  97. 'No paper towels in toilets' sign or stencil for bathrooms - Brant, low priority
  98. Wire Speakers in West Room - Kevin B., Dan J. (some wired up)
  • Permanent wiring for the Red Dragon - #6 wire and conduit to a panel with open breakers - Tom G.
  • Permanent air lines for the red dragon - flex air lines - See Tom G>

* Install the doors with windows: 2 in the south wall of the electronics lab and one between the east room and vestibule.

  1. Exhaust fan and hood for the pottery area - See Tom G. or Brant H.
  2. Fix the broken toilet seat in the men's room.
  3. Build “Third Wall” in the Impound Lot. (See Kathryn for Instructions)
  4. Deal with trip hazard by pinball machine (See Markus for details.)
  5. Install additional security cameras if necessary.
  6. Look at electric strikeplate on the front door. Repair and/or order replacement (The BOD has already appropriated funds if this is needed)
  7. Fix the louvers on the weld shop fan so they close correctly. - Dan J.
  8. Tear apart the hobo trap. (picnic table at Lennox and Otjen) - Oct. 2019
  9. Organize and downsize the books in the library and determine what books can be tossed. (Need a long term member and a newer member for this job.See Jon H.) - Oct. 2019 I think
  10. Bring in the large bookcase from next to the Dalek area and replace two smaller bookcases with it after the library has been sorted and downsized. - Oct. 2019 I think