User Tools

Site Tools


boardmeetingagenda:2019-03-21

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
boardmeetingagenda:2019-03-21 [2019/03/22 00:10]
pupstarfire [Review and approval of the Minutes of the previous meeting]
boardmeetingagenda:2019-03-21 [2019/03/22 14:08] (current)
raster
Line 11: Line 11:
   * Becca   * Becca
   * Pete   * Pete
 +  * Billy K
  
 == Absent == == Absent ==
-  * Billy K+  * ...
  
 == Guests == == Guests ==
   * Steve   * Steve
   * Tony   * Tony
 +  * Adrian
  
  
Line 30: Line 32:
 ==== Treasurers Report ==== ==== Treasurers Report ====
   * Find the current treasurer report [[:treasurerreports|here.]]    * Find the current treasurer report [[:treasurerreports|here.]] 
-  * Dan has called and Faxed the IRS and we have been granted a 60 day extension which should be approved with no late penalty fine.+  * IRS fine was revised.
   * We may want to discuss the wisdom of paying a CPA to file on our behalf. We did this several years ago and it cost us $300 per year.   * We may want to discuss the wisdom of paying a CPA to file on our behalf. We did this several years ago and it cost us $300 per year.
   * If we do not, we should make a greater effort to review our filing with multiple people before sending to avoid a recurrence.   * If we do not, we should make a greater effort to review our filing with multiple people before sending to avoid a recurrence.
Line 37: Line 39:
 ==== Building Maintenance/Issues ==== ==== Building Maintenance/Issues ====
   * **Update**   * **Update**
-    * Power reel yet to be installed in Craft Lab +    * Power reel HAS NOW BEEN installed in Craft Lab
-    * Focus on Energy Credit have check +
-   +
  
 + 
 ===== Reports of Special (Select) Committees ===== ===== Reports of Special (Select) Committees =====
   * Outreach committee - Planning stages for fundraisers for the spring.   * Outreach committee - Planning stages for fundraisers for the spring.
Line 52: Line 53:
     * Abuse in the Metal shop is still occurring see Lost and Found Box notes     * Abuse in the Metal shop is still occurring see Lost and Found Box notes
    
- 
-==== MATC Program ==== 
-  * **Last Status** 
-    * MATC new VP meet with Dan and Markus and seems excited to merge their talents into the Makerspace. 
- 
- 
 ==== Clarification of Policy on teaching classes to non members ==== ==== Clarification of Policy on teaching classes to non members ====
   * **Last Status**   * **Last Status**
Line 66: Line 61:
     * Make it clear that if a member accepts payment for the class, they are no longer covered by the space's liability insurance and should buy their own.     * Make it clear that if a member accepts payment for the class, they are no longer covered by the space's liability insurance and should buy their own.
     * Does not apply to guests working on personal projects.     * Does not apply to guests working on personal projects.
- 
-  * **Anodizing proposal** 
-    * Kathy Cannistra sent an [[https://groups.google.com/d/topic/bod-milwaukeemakerspace/GtTLEd5fwog/discussion|email]] on February 18th, 2018 proposing to put the anodizing station in the vault hallways in the area where to grill currently is. Venting options would be out the door, through a new wall hole or tubed through to the paint room fan. 
-    * Kathy is plagued with a chalky mess, needs time to figure out where its coming from. 
- 
-==== Donation Boxes ==== 
-  * **Last Status** 
-    * Soda and popcorn donation boxes 
- 
-==== Space Improvement Day ==== 
-  * **Last Status** 
-    * Incentive ideas (McDonald's gift cards, recognition certificate) 
- 
-==== Lost and Found boxes ==== 
-  * **Last Status** 
-  * Still building Metal shop lost and found boxes 
  
 * **Flooring** * **Flooring**
-    * Redo Flooring Kyle getting quotes for Cafe Area +    * all 6 vote approval for flooring 
-    * Mirror for above cafe area+    * 700 dollars for flooring est. 
  
   * **New building**   * **New building**
-    * Tom G Letter of intent +    * Tom G was issued a Letter of intent 
-    * Waiting for bank to ask for the letter +    * Rezoning and drawings in progress
-    * Re-zoning for the new makerspace building+
  
   * **Lighting /Graffiti**   * **Lighting /Graffiti**
     * Exterior Building lighting - Tom G     * Exterior Building lighting - Tom G
     * Lighting the side of building attempt to reduce graffiti also talk to neighborhood      * Lighting the side of building attempt to reduce graffiti also talk to neighborhood 
-    * Board approved research to better lighting+    * Big LED light was acquired that can be aimed.
  
   * **ADA Compliance - to be presented by Chris H.**   * **ADA Compliance - to be presented by Chris H.**
Line 101: Line 79:
     * Non-formal assessment of ADA was done     * Non-formal assessment of ADA was done
     * Ramp may be looked into this spring or when we redo the parking lot     * Ramp may be looked into this spring or when we redo the parking lot
-    * Talk of putting a working key fob reader 
-    * Dan has working door fob just needs handle 
     * Chris H got approved to get more estimates     * Chris H got approved to get more estimates
  
Line 113: Line 89:
   * **Spring Elections**   * **Spring Elections**
     * Discuss the plan...     * Discuss the plan...
 +    * postions up for election : Treasurer, secretary, member at large, facility director
 +    * Nominations open up April 2nd
 +    * adrian and markus will coordinate the elections
  
   * **Wiki login for new users**   * **Wiki login for new users**
Line 118: Line 97:
  
   * **Makerfaire funding requests**   * **Makerfaire funding requests**
-    * how do we handle the budget with the outreach comittee+    * Forms will be made for requests for funds 
 +    * how do we handle the budget with the outreach committee 
 +    * discussion of funding flat amount or a match rate from fundraising 
 +    * 6-1 vote to notify membership of a proposal requesting putting 5k toward outreach programs
  
   * **Large projects in the east room**   * **Large projects in the east room**
Line 132: Line 114:
  
 ===== Close ===== ===== Close =====
-  * Meeting was adjourned at+  * Meeting was adjourned at 8:38pm
  
  
boardmeetingagenda/2019-03-21.1553213449.txt.gz · Last modified: 2019/03/22 00:10 by pupstarfire