 ===== Current To Do List =====  ===== Current To Do List ===== 
        
-==== Punch List for Sat. November 23, 2019 ==== +==== Punch List for Sat. ???ember %%, 2019 ====
-  - **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area+
   - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing. ​   - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing. ​
   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.
Line 20: Line 19:
   - SUPERIMPORTANT:​ Clean out the ceiling ventilation filter in the Woodshop.   - SUPERIMPORTANT:​ Clean out the ceiling ventilation filter in the Woodshop.
   - More work needed on the compressed air dryer (See Markus or Tom G.)   - More work needed on the compressed air dryer (See Markus or Tom G.)
-  - There are storage shelves need to have items moved to IMPOUND, VB102-Wilhelm,​ VD301-Kutzner,​ VA303-Theiler,​ VF304-Mondry,​(See Kathy H.) **This month the items in the Impound Lot will be disseminated to area champions, the Up-For-Grabs table and the appropriate hack racks.**  ​+  - Drain the compressor hoses
   - Design and build a cabinet for storing safety goggles. ​   - Design and build a cabinet for storing safety goggles. ​
   - Scrub the sinks in the mud room.   - Scrub the sinks in the mud room.
Line 26: Line 25:
   - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.)   - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.)
   - Clear off stuff of little usefulness from Up For Grabs Table. ​   - Clear off stuff of little usefulness from Up For Grabs Table. ​
-  - __Areas that need TLC__Craft lab counter, ​Hack Rack in Laser Lab, Paint Room +  - __Areas that need TLC this Month__: Hack Rack in Laser Lab,
   - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) ​   - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) ​
-  - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. 
   - {{:​miscellaneous:​lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:​maintenance|here]])<​- The highlighted pdf. is found here as well.(Joe Tomich) ​   - {{:​miscellaneous:​lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:​maintenance|here]])<​- The highlighted pdf. is found here as well.(Joe Tomich) ​
   - Check and restock first-aid kits, (and update the page [[miscellaneous:​maintenance|here]])  ​   - Check and restock first-aid kits, (and update the page [[miscellaneous:​maintenance|here]])  ​
-  - Vacuum Cafe area at the end of the day after the feast. ​ 
   - Red ticket abandoned projects in East Room.   - Red ticket abandoned projects in East Room.
   - Check paper towel stock   - Check paper towel stock
Line 38: Line 35:
   - Make sure parking permit/​ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/​tickets.   - Make sure parking permit/​ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/​tickets.
   - Clean out vacuum cleaner filters   - Clean out vacuum cleaner filters
-  - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) +  ​- Clean the Cafe area at the end of the day after the feast 
-  - Jack Hammer apart the old Dumpster Pad in spring. ​+  ​- Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) ​
   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) ​   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) ​
 **See if any of the following need replacing** **See if any of the following need replacing**
Line 45: Line 42:
   - Replace furnace filters if needed (and update the page [[miscellaneous:​maintenance|here]])   - Replace furnace filters if needed (and update the page [[miscellaneous:​maintenance|here]])
   - Replace wood shop air filters (ongoing) ​   - Replace wood shop air filters (ongoing) ​
 +  - Jack Hammer apart the old Dumpster Pad in spring. 
 +  - 
  
 ===== Standing To-Do/​Cleanup Day Items ===== ===== Standing To-Do/​Cleanup Day Items =====
Line 131: Line 129:
  
 ===== Completed Projects ===== ===== Completed Projects =====
 +  - <​del>​- ​
 +  - <​del>​- **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area
   - <​del>​- **FIX LIGHT FIXTURE IN CERAMICS VAULT**</​del>​ Jeff M. did it   - <​del>​- **FIX LIGHT FIXTURE IN CERAMICS VAULT**</​del>​ Jeff M. did it
   - <​del>​- Add Electrical outlet in the cafe area.</​del>​ Mike Tarnowski   - <​del>​- Add Electrical outlet in the cafe area.</​del>​ Mike Tarnowski