User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
spaceprojs [2019/07/02 23:17]
kathughett
spaceprojs [2019/07/13 02:00] (current)
kathughett
Line 16: Line 16:
   - SUPERIMPORTANT:​ Clean out the ceiling ventilation filter in the Woodshop.   - SUPERIMPORTANT:​ Clean out the ceiling ventilation filter in the Woodshop.
   - More work needed on the compressed air dryer (See Markus or Tom G.)   - More work needed on the compressed air dryer (See Markus or Tom G.)
 +  - Organize and downsize the books in the library and determine what books can be tossed. (Need a long term member and a newer member for this job.) 
   - Revamp the Cafe area floor. (See Kyle)   - Revamp the Cafe area floor. (See Kyle)
   - Scrub the sinks in the mud room.   - Scrub the sinks in the mud room.
Line 33: Line 34:
   - Clean out vacuum cleaner filters   - Clean out vacuum cleaner filters
   - Finish Milwaukee Tools Cabinet   - Finish Milwaukee Tools Cabinet
-  - Organize and downsize the books in the library and determine what books can be tossed. (Need a long term member and a newer member for this job.)  
   - Bring in the large bookcase from next to the Dalek area and replace two smaller bookcases with it after the library has been sorted and downsized. ​   - Bring in the large bookcase from next to the Dalek area and replace two smaller bookcases with it after the library has been sorted and downsized. ​
   - Paint wall in Lobby area. (Project on hold)   - Paint wall in Lobby area. (Project on hold)
spaceprojs.txt · Last modified: 2019/07/13 02:00 by kathughett