User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
spaceprojs [2019/04/01 23:36]
kathughett
spaceprojs [2019/04/02 00:34] (current)
kathughett
Line 13: Line 13:
   - Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up.    - Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up. 
   - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color)  ​   - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color)  ​
-  - Clean graffiti off of external East Wall. +  - Clean graffiti off of external East Wall. We were been notified by Neighborhood services on 3/27/2019.
-  - Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus for instruction.+
   - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) ​   - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) ​
-  - Move Punch Press to leather working Area 
   - Clean out clog in the compressed air dryer (See Markus or Tom G.)   - Clean out clog in the compressed air dryer (See Markus or Tom G.)
-  ​- Reconfigure Work Tables in East Room +  - Move dishware to rolling cabinets and mount shelves for small appliances. ​*Contingent on getting rolling islands for cafe.* ​ 
-  - Complete dissemination and removal of recent donation in the East Room +  - Move bookcase to library replacing smaller bookcase. ​*Contingent on getting rolling islands ​for cafe. 
-  ​- Move dishware to rolling cabinets and mount shelves for small appliances.  +  - Revamp the Cafe area floor. (See Kyle) *Contingent on getting rolling islands for cafe.* ​ 
-  - Move bookcase to library replacing smaller bookcase. ​ +  - Move smaller bookcase out to craft lab hallway ​for 1 week.  ​*Contingent on getting rolling islands for cafe.
-  - Move smaller bookcase out to craft lab hallway ​for 1 week +
-  - Make sure Cart Space PA103 has been vacated +
-  - Revamp the Cafe area floor. (See Kyle) +
-  - Double check to see if the clocks were updated +
-  - Rearrange space in Machine shop to make room for the new Tormach. +
-  - Anchor the crane in the metal shop(5/8 wedge anchors at least 2-3/4 deep. see Markus) ​+
   - Scrub the sinks in the mud room.   - Scrub the sinks in the mud room.
   - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now.   - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now.
-  - Organize the paint room shelves. Dust off cans.  
   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) ​   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) ​
   - {{:​miscellaneous:​lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:​maintenance|here]])   - {{:​miscellaneous:​lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:​maintenance|here]])
Line 36: Line 27:
   - Replace wash sink water filters (and update the page [[miscellaneous:​maintenance|here]])   - Replace wash sink water filters (and update the page [[miscellaneous:​maintenance|here]])
   - Replace furnace filters if needed (and update the page [[miscellaneous:​maintenance|here]])   - Replace furnace filters if needed (and update the page [[miscellaneous:​maintenance|here]])
-  - Replace wood shop air filters (ongoing) +  - Replace wood shop air filters (ongoing)  
-  - Clean up Cosplay room. Clear path to server room door.  +  - Disseminate contents of Impound Lot IF needed.
-  - Disseminate contents of IMPOUND LOT if needed.+
   - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first)   - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first)
   - Vacuum Cafe area at the end of the day after the feast. ​   - Vacuum Cafe area at the end of the day after the feast. ​
Line 74: Line 64:
   - Parking sign for Building - electronic (still desired?​) ​   - Parking sign for Building - electronic (still desired?​) ​
   - Finish the exterior south east entrance (vault hall). ​ The ceiling panels door need to be caulked and painted. (See Tom G.)   - Finish the exterior south east entrance (vault hall). ​ The ceiling panels door need to be caulked and painted. (See Tom G.)
-  - Paint new brick work outside the building by the welding and paint booth vents.+  - Paint new brick work outside the building by the welding and paint booth vents. Need to find out from Tom G. what and where
   - Repair broken bricks & tuckpointing around the outside of the building.   - Repair broken bricks & tuckpointing around the outside of the building.
  
Line 84: Line 74:
   - Get an ice maker working in one of the refrigerators (kegerator has one)   - Get an ice maker working in one of the refrigerators (kegerator has one)
   - Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle.   - Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle.
-  - Access control system at Vault entrance - Dan J. 
   - Paint new brick work inside the vault hall   - Paint new brick work inside the vault hall
   - Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J.   - Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J.
Line 97: Line 86:
 ===== Completed Projects ===== ===== Completed Projects =====
  
 +  - <​del>​- Rearrange space in Metal shop to make room for the new Tormach.</​del> ​
 +  - <​del>​- Access control system at Vault entrance - Dan J. </​del> ​
 +  - <​del>​- Install handle on exterior door of vault hallway. </​del> ​
 +  - <​del>​- Organize the paint room shelves. Dust off cans. Done by Marie Gentil. </​del> ​
 +  - <​del>​- Anchor the crane in the metal shop. (5/8 wedge anchors at least 2-3/4 deep. see Markus)</​del>  ​
 +  - <​del>​- Clean and repair new used grill. </​del> ​ (Done by Dan Luglio)
 +  - <​del>​- Move Punch Press to leather working Area. </​del> ​
 +  - <​del>​- Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus.</​del> ​
   - <​del>​- Build a large rolling island with cabinets below for storage</​del>​ (Tom Gondek)   - <​del>​- Build a large rolling island with cabinets below for storage</​del>​ (Tom Gondek)
   - <​del>​- Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind.</​del>​   - <​del>​- Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind.</​del>​
spaceprojs.txt · Last modified: 2019/04/02 00:34 by kathughett