User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
spaceprojs [2019/03/16 23:53]
kathughett
spaceprojs [2019/03/16 23:53] (current)
kathughett
Line 16: Line 16:
   - Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus for instruction.   - Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus for instruction.
   - Clean Up the New-To-the-Makerspace Grill   - Clean Up the New-To-the-Makerspace Grill
-  - Revamp the Cafe area floor and build a large rolling island with cabinets below for storage(See Kyle & Tom Gondek).+  - Revamp the Cafe area floor and build a large rolling island with cabinets below for storage(See Kyle)
   - Clean graffiti off of external East Wall.    - Clean graffiti off of external East Wall. 
   - Rearrange space in Machine shop to make room for the new Tormach.   - Rearrange space in Machine shop to make room for the new Tormach.
spaceprojs.txt · Last modified: 2019/03/16 23:53 by kathughett