spaceprojs [2019/01/28 17:24]
wildapricot-schneider_markus [Punch List for January 2019]
spaceprojs [2019/02/15 23:51] (current)
kathughett
Line 15: Line 15:
   - Vacuum Cafe area at the end of the day after the feast. ​   - Vacuum Cafe area at the end of the day after the feast. ​
   - Red ticket abandoned projects in East Room.   - Red ticket abandoned projects in East Room.
 +  - Remove fluorescent lights in vault hallway in spaces VA103 & VA104. (brought in by Matt Melk).
 +  - Revamp the Cafe area floor and build a large rolling island with cabinets below for storage(See Kyle & Tom Gondek).
   - Install suspended electrical hookup above craft lab table. (Colleen and Markus)   - Install suspended electrical hookup above craft lab table. (Colleen and Markus)
   - Add 8 additional lights to the metal shop. They need to be wired in. See Tom K. for instructions. ​   - Add 8 additional lights to the metal shop. They need to be wired in. See Tom K. for instructions. ​
   - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now.   - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now.
-  - Disseminate contents of IMPOUND LOT. 
   - Organize the paint room shelves. Dust off cans.    - Organize the paint room shelves. Dust off cans. 
   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) ​   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) ​
Line 26: Line 27:
   - Replace furnace filters if needed (and update the page [[miscellaneous:​maintenance|here]])   - Replace furnace filters if needed (and update the page [[miscellaneous:​maintenance|here]])
   - Replace wood shop air filters (ongoing)   - Replace wood shop air filters (ongoing)
-  - Revamp the Cafe area and build a large rolling island with cabinets below for storage(See Kyle). 
   - Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind.    - Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind. 
   - Clean up Cosplay room. Clear path to server room door.    - Clean up Cosplay room. Clear path to server room door. 
 +  - Disseminate contents of IMPOUND LOT if needed.
   - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first)   - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first)
-  - Install additional lights in vault hallway. (brought in by Matt Melk).(Does anyone still feel that we need to do this?)+
  
 ===== Standing To-Do/​Cleanup Day Items ===== ===== Standing To-Do/​Cleanup Day Items =====