Be Excellent to the 'Space

These are projects that need to be done around the space for the benefit of the space. If you want to help out on a project dig right in, if you need guidance ask a board member, if you want help with a project post to the group and see who wants to help.

Once you start working on a project put your name after it. Once you finish a project move it down to the finished list so people know who to thank.

Current To Do List

Punch List for February 2019

  1. First thing - Vacuum cafe area and meeting room.
  2. Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up.
  3. Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color)
  4. Vacuum Cafe area at the end of the day after the feast.
  5. Red ticket abandoned projects in East Room.
  6. Install suspended electrical hookup above craft lab table. (Colleen and Markus)
  7. Add 8 additional lights to the metal shop. They need to be wired in. See Tom K. for instructions.
  8. See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now.
  9. Disseminate contents of IMPOUND LOT.
  10. Organize the paint room shelves. Dust off cans.
  11. Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director)
  12. Check and restock first-aid kits, (and update the page here)
  13. Replace wash sink water filters (and update the page here)
  14. Replace furnace filters if needed (and update the page here)
  15. Replace wood shop air filters (ongoing)
  16. Revamp the Cafe area and build a large rolling island with cabinets below for storage(See Kyle).
  17. Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind.
  18. Clean up Cosplay room. Clear path to server room door.
  19. Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first)
  20. Install additional lights in vault hallway. (brought in by Matt Melk).(Does anyone still feel that we need to do this?)

Standing To-Do/Cleanup Day Items

General

  1. Replace burned out bulbs
  2. Wash off meeting room tables
  3. Clean out ashtray next to alley door
  4. Crush Aluminum cans in Recycling bin
  5. Vacuum carpeted areas
  6. Organize Hack Racks
  7. Sweep Hallway adjacent to Cosplay room
  8. Sweep Vault Hallway
  9. Sweep East Room and West Room
  10. Clean bathrooms
  11. Inventory member storage against a printout of the wiki, then crosscheck that with active member list (Board member needed for this) so we can clear off empty spaces. (Ongoing by Kathy H.)

Website

  1. Several pages on our website receive an relatively large amount of traffic, but are not updated
    1. Update photos HERE with new ones already taken and on Makervault
    2. Take photos from existing blog posts, and add them to the gallery here HERE
  2. Make a blog post about your recent project!

Outdoors

  1. Alley lights - Need volunteers, See Tom G.
  2. Parking sign for Building - electronic (still desired?)
  3. Finish the exterior south east entrance (vault hall). The ceiling panels door need to be caulked and painted. (See Tom G.)
  4. Paint new brick work outside the building by the welding and paint booth vents.
  5. Repair broken bricks & tuckpointing around the outside of the building.

Building/Infrastructure

  1. Air compressor drain system - connect the dryer drain to the big tank. (Has this been done?)
  2. Automatic gas control for the TIG welder and reminder light that the gas is still on for both welders - See Tom G.
  3. Get an ice maker working in one of the refrigerators (kegerator has one)
  4. Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle.
  5. Access control system at Vault entrance - Dan J.
  6. Paint new brick work inside the vault hall
  7. Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J.

Laser Lab

  1. Vacuum inside cutters
  2. Clean all lenses and mirrors
  3. Clean and graphite Z-axis elevator screws
  4. Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces

Completed Projects

  1. Build a box for Charcoal filters for the laser cutter exhaust system.Completed by Markus, Tony W., Brant
  2. Replace the ceiling tiles in the vault hallway Tom G.
  3. Signage for tall storage. Kathy H.
  4. The Tall storage needs to be gone through and the items with expired parking permits beyond two weeks time need to be moved to the impound lot.(Wolfgang and Alex G.)
  5. Put long folding tables on cart on top of pallet racks on south end. Power wheels car with horse needs to get moved to a single open spot.
  6. Sort and recycle metals No one to help and gaylord became dumping place for e-waste
  7. Install wiring for new kiln in ceramics area. Tom G., Shane, Tony, Jeff
  8. INSTALL PRESSBAR ON SOUTHWEST DOOR to disable unlocking mechanism. Whoever does this gets to be first in line for food. This was done by Billy and Tom K.
  9. Clean Up and organize the Cafe' shelves after March SID. Heidi Z. & Colleen L.
  10. Paint Room Demo & Redo (Brant H. & Tom Gr.)
  11. Put edging around large table in Craft Lab. (Colleen)
  12. Complete the plumbing for sink in men's room.Do we need a professional plumber(Wolfgang did the spackling, Kyle installed the sink, unsure of who did the plumbing.)
  13. Complete new storage plan. Finished by David Draeger and a team of members
  14. Outlet for the pinball machine and door bell - get rid of the extension cords Tom G.
  15. Install new Wood shop dust collection system. (Done in 2017)
  16. Remove the old buckets of Silk screening paint. Tony & Kyle did this.
  17. Clean and organize top shelf of hardware bins in Metal Shop.(Started by Rik S.)
  18. Network cables run to New 3D Lab (Completed by Tony W., Marcin, Mark, Eric)
  19. 3D Printing moves to Willies old boat area.
  20. Black Shelves from Ladies coat room goes into old 3D area.
  21. White shelves from Cooties room go into Ladies coat room.
  22. Cosplay Group moves into former Cooties room.
  23. Batteries replaced in vault hallway thermostat (Steve Pilon 11/11/17)
  24. Install awnings over the outside doors. (Rik Stardy, Marcin Polewski, Steffanie Maher, and Dan Jonke. Completed 11/5/2017
  25. Replace Batteries in some of the clocks
  26. Projection system needs a new VGA HDMI
  27. Clear out open area in East Room for Maker Faire projects
  28. Get Impound lot ready for raffle in July. (Photos & numbers)
  29. Install an automatic drain on the big tank.- See Tom G .
  30. Install new water cooler- Timothy Campbell did this!
  31. Permanent charging station for the forklift.
  32. Replace gasket/diaphragm in the self-filling water cooler
  33. Come up with scrap metal bins to hold small pieces so they don't spill everywhere.
  34. Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws.
  35. Mount a good grinder in the welding area for sharpening TIG electrodes.
  36. Pinball machine repairs, a never ending project
  37. Mount 911 phones by exit doors - See Adrian
  38. Remove manual lock/unlock from alley doors
  39. Fix numeric pad on Door 1 - Royce did this!
  40. Level CNC plasma table - Marc and helpers did this!
  41. Install new pallet racking for member storage shelves - Lots of people helped with this
  42. Make “Park on SAME/OPPOSITE” signs for posting outside on meeting nights - Keith did this
  43. FIX FLASHING - Rick did this!
  44. Check on auto-filling water cooler leak
  45. Remove large format printer
  46. Reorganize the area around the vacuum former, to allow it to be used
  47. Mount the cork board by the desk in the lobby
  48. Some attention should be paid to the small sand blaster window, to see if we can make it more usable
  49. Power column for the conference table in the meeting room - See Tom G. and Adrian V.
  50. SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.
  51. Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router.
  52. Do something with the VLAT.
  53. Remove the old heater above the back hall from the craft shop so we can hang new lights
  54. Hang new lights in the craft shop hall.
  55. Move the exhaust fan for the laser cutters and duct it.
  56. Gas line for the forge and furnace - Tom, Dan J.
  57. Outlets on the columns in the East room - Tom
  58. Paint exterior door frames where the new doors were installed. Caulk when done. - Dan J., ?
  59. Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. - Ed, ?
  60. Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving. - Made redundant by bollard installation.
  61. Hang speakers in West Room - Kevin B., Dan J.
  62. Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard. - Vishal, ChrisH, JimR, others
  63. Power the dust collector in the wood shop - Tom G
  64. Install Air Lines - Joe R. and Chris H.
  65. Clean out Vault 1 and make rentable - Tiffany, Sean
  66. Organize plotters and screen printing and pottery areas - SteveP, Brant, Pete, DL, others
  67. Move shelving into vault hallway - Tiffany, Sean, Brant, etc.
  68. Find a home for the bar - Meh, good enough for now
  69. Hang mirror over wash sink - Brant
  70. Replace the light socket on the vertical band saw.
  71. Fix the 25W laser - find out if its the tube or the power supply.
  72. Power up the 3 headed drill press (only 2 heads left)
  73. Tool pegboard - make something to hold pliers and Allen keys better.
  74. Wash the carpet - try to get out some of the water stains.
  75. PA system/phones - Chris H. (done)
  76. 'No paper towels in toilets' sign or stencil for bathrooms - Brant, low priority
  77. Wire Speakers in West Room - Kevin B., Dan J. (some wired up)
  • Permanent wiring for the Red Dragon - #6 wire and conduit to a panel with open breakers - Tom G.
  • Permanent air lines for the red dragon - flex air lines - See Tom G>

* Install the doors with windows: 2 in the south wall of the electronics lab and one between the east room and vestibule.

  1. Exhaust fan and hood for the pottery area - See Tom G. or Brant H.
  2. Fix the broken toilet seat in the men's room.
  3. Build “Third Wall” in the Impound Lot. (See Kathryn for Instructions)
  4. Deal with trip hazard by pinball machine (See Markus for details.)
  5. Install additional security cameras if necessary.
  6. Look at electric strikeplate on the front door. Repair and/or order replacement (The BOD has already appropriated funds if this is needed)
  7. Fix the louvers on the weld shop fan so they close correctly. - Dan J.

To Do List, abandoned 10/11/13, last updated 08/09/13
To Do List, from moving into Lenox

spaceprojs.1548696284.txt.gz · Last modified: 2019/01/28 17:24 by wildapricot-schneider_markus