User Tools

Site Tools


spaceprojs

This is an old revision of the document!


Be Excellent to the 'Space

These are projects that need to be done around the space for the benefit of the space. If you want to help out on a project dig right in, if you need guidance ask a board member, if you want help with a project post to the group and see who wants to help.

Once you start working on a project put your name after it. Once you finish a project move it down to the finished list so people know who to thank.

Current To Do List

Punch List for June 2018

  • Scrap to Cash There shouldn't be any. Please dispose of your own e-waste (See Tom G.)
  • #1 Vacuum cafe area and meeting room.
  • #2 Sanitize cafe tables and meeting room tables.
  • Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color)
  • See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now.
  • Vacuum Cafe area at the end of the day again.
  • Put up “Third Wall” in the Impound Lot.
  • Put long folding tables on cart on top of pallet racks on south end. Power wheels car with horse needs to get moved to a single open spot.
  • Install additional lights in vault hallway. (brought in by Matt Melk).(Should we get an electrician for this?)
  • Deal with trip hazard by pinball machine (See Markus for details.)
  • Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first)
  • Install additional security cameras if necessary. (Tony if he feels like it and if we have them)
  • Mount racks for gas tanks along outside of welding shop wall?
  • Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director)
  • Check and restock first-aid kits, (and update the page here)
  • Replace wash sink water filters (and update the page here)
  • Replace furnace filters if needed (and update the page here)
  • Replace wood shop air filters (ongoing)
  • Look at electric strikeplate on the front door. Repair and/or order replacement (The BOD has already appropriated funds if this is needed)
  • Revamp the Cafe area and build a large rolling island with cabinets below for storage(See Kyle).

Standing To-Do/Cleanup Day Items

General

  • Replace burned out bulbs
  • Wash off meeting room tables
  • Clean out ashtray next to alley door
  • Crush Aluminum cans in Recycling bin
  • Vacuum carpeted areas
  • Organize Hack Racks
  • Sweep Hallway adjacent to Cosplay room
  • Sweep Vault Hallway
  • Sweep East Room and West Room
  • Clean bathrooms
  • Inventory member storage against a printout of the wiki, then crosscheck that with active member list (Board member needed for this) so we can clear off empty spaces. (Ongoing by Kathy H.)

Website

  • Several pages on our website receive an relatively large amount of traffic, but are not updated
    • Update photos HERE with new ones already taken and on Makervault
    • Take photos from existing blog posts, and add them to the gallery here HERE
  • Make a blog post about your recent project!

Outdoors

  • Alley lights - Need volunteers, See Tom G.
  • Parking sign for Building - electronic (still desired?)
  • Finish the exterior south east entrance (vault hall). The ceiling panels door need to be caulked and painted. (See Tom G.)
  • Paint new brick work outside the building by the welding and paint booth vents.
  • Repair broken bricks & tuckpointing around the outside of the building.

Building/Infrastructure

  • Air compressor drain system - connect the dryer drain to the big tank. (Has this been done?)
  • Automatic gas control for the TIG welder and reminder light that the gas is still on for both welders - See Tom G.
  • Get an ice maker working in one of the refrigerators (kegerator has one)
  • Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle.
  • Access control system at Vault entrance - Royce P.
  • Paint new brick work inside the vault hall
  • Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J.
  • Fix the louvers on the weld shop fan so they close correctly. - Dan J.

Laser Lab

  • Vacuum inside cutters
  • Clean all lenses and mirrors
  • Clean and graphite Z-axis elevator screws
  • Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces

Completed Projects

  • Sort and recycle metals No one to help and gaylord became dumping place for e-waste
  • Install wiring for new kiln in ceramics area. Tom G., Shane, Tony, Jeff
  • INSTALL PRESSBAR ON SOUTHWEST DOOR to disable unlocking mechanism. Whoever does this gets to be first in line for food. This was done by Billy and Tom K.
  • Clean Up and organize the Cafe' shelves after March SID. Heidi Z. & Colleen L.
  • Paint Room Demo & Redo (Brant H. & Tom Gr.)
  • Put edging around large table in Craft Lab. (Colleen)
  • Complete the plumbing for sink in men's room.Do we need a professional plumber(Wolfgang did the spackling, Kyle installed the sink, unsure of who did the plumbing.)
  • Complete new storage plan. Finished by David Draeger and a team of members
  • Outlet for the pinball machine and door bell - get rid of the extension cords Tom G.
  • Install new Wood shop dust collection system. (Done in 2017)
  • Remove the old buckets of Silk screening paint. Tony & Kyle did this.
  • Clean and organize top shelf of hardware bins in Metal Shop.(Started by Rik S.)
  • Network cables run to New 3D Lab (Completed by Tony W., Marcin, Mark, Eric)
  • 3D Printing moves to Willies old boat area.
  • Black Shelves from Ladies coat room goes into old 3D area.
  • White shelves from Cooties room go into Ladies coat room.
  • Cosplay Group moves into former Cooties room.
  • Batteries replaced in vault hallway thermostat (Steve Pilon 11/11/17)
  • Install awnings over the outside doors. (Rik Stardy, Marcin Polewski, Steffanie Maher, and Dan Jonke. Completed 11/5/2017
  • Replace Batteries in some of the clocks
  • Projection system needs a new VGA HDMI
  • Clear out open area in East Room for Maker Faire projects
  • Get Impound lot ready for raffle in July. (Photos & numbers)
  • Install an automatic drain on the big tank.- See Tom G .
  • Install new water cooler- Timothy Campbell did this!
  • Permanent charging station for the forklift.
  • Replace gasket/diaphragm in the self-filling water cooler
  • Come up with scrap metal bins to hold small pieces so they don't spill everywhere.
  • Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws.
  • Mount a good grinder in the welding area for sharpening TIG electrodes.
  • Pinball machine repairs, a never ending project
  • Mount 911 phones by exit doors - See Adrian
  • Remove manual lock/unlock from alley doors
  • Fix numeric pad on Door 1 - Royce did this!
  • Level CNC plasma table - Marc and helpers did this!
  • Install new pallet racking for member storage shelves - Lots of people helped with this
  • Make “Park on SAME/OPPOSITE” signs for posting outside on meeting nights - Keith did this
  • FIX FLASHING - Rick did this!
  • Check on auto-filling water cooler leak
  • Remove large format printer
  • Reorganize the area around the vacuum former, to allow it to be used
  • Mount the cork board by the desk in the lobby
  • Some attention should be paid to the small sand blaster window, to see if we can make it more usable
  • Power column for the conference table in the meeting room - See Tom G. and Adrian V.
  • SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.
  • Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router.
  • Do something with the VLAT.
  • Remove the old heater above the back hall from the craft shop so we can hang new lights
  • Hang new lights in the craft shop hall.
  • Move the exhaust fan for the laser cutters and duct it.
  • Gas line for the forge and furnace - Tom, Dan J.
  • Outlets on the columns in the East room - Tom
  • Paint exterior door frames where the new doors were installed. Caulk when done. - Dan J., ?
  • Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. - Ed, ?
  • Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving. - Made redundant by bollard installation.
  • Hang speakers in West Room - Kevin B., Dan J.
  • Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard. - Vishal, ChrisH, JimR, others
  • Power the dust collector in the wood shop - Tom G
  • Install Air Lines - Joe R. and Chris H.
  • Clean out Vault 1 and make rentable - Tiffany, Sean
  • Organize plotters and screen printing and pottery areas - SteveP, Brant, Pete, DL, others
  • Move shelving into vault hallway - Tiffany, Sean, Brant, etc.
  • Find a home for the bar - Meh, good enough for now
  • Hang mirror over wash sink - Brant
  • Replace the light socket on the vertical band saw.
  • Fix the 25W laser - find out if its the tube or the power supply.
  • Power up the 3 headed drill press (only 2 heads left)
  • Tool pegboard - make something to hold pliers and Allen keys better.
  • Wash the carpet - try to get out some of the water stains.
  • PA system/phones - Chris H. (done)
  • 'No paper towels in toilets' sign or stencil for bathrooms - Brant, low priority
  • Wire Speakers in West Room - Kevin B., Dan J. (some wired up)
  • Permanent wiring for the Red Dragon - #6 wire and conduit to a panel with open breakers - Tom G.
  • Permanent air lines for the red dragon - flex air lines - See Tom G>

* Install the doors with windows: 2 in the south wall of the electronics lab and one between the east room and vestibule.

  • Exhaust fan and hood for the pottery area - See Tom G. or Brant H.

To Do List, abandoned 10/11/13, last updated 08/09/13
To Do List, from moving into Lenox

spaceprojs.1532730579.txt.gz · Last modified: 2018/07/27 22:29 by kathughett