User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
spaceprojs [2018/05/26 20:12]
kathughett [Punch List for May 2018]
spaceprojs [2022/12/16 18:12] (current)
wildapricot-schultz_hannah [Punch List for Saturday, December 17th 2022]
Line 9: Line 9:
 ===== Current To Do List =====  ===== Current To Do List ===== 
        
-==== Punch List for May 2018 ==== +==== Punch List for Saturday, December 17th 2022 ==== 
-  * **Scrap to Cash** (See Tom G.) +  **First thing** - Vacuum meeting room so that the dust can settle before we do the second thing.  
-  * First thing,vacuum cafe area and meeting room. +  - **Second thing** - Mop Cafe floor and Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up
-  * Second thingSanitize cafe tables and meeting room tables.  +  - Vacuum the carpeted areas.   
-  * Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance(It's a dusty maroon color)   +  - **Clean out the Toaster, Toaster Ovenand Microwave.** 
-  * See if there are enough trash bags in the green supply cabinet by the men's room. If not enoughbuy more now+  **SUPER IMPORTANT**: Clean out the ceiling ventilation filter in the Woodshop
-  * Put up "Third Wall" in the Impound Lot. (Kyle Wand Erich Z.) +  - put items on pallet in East room on hack racks or up for grabs 
-  * Put edging around large table in Craft Lab. (Colleen) +  - focus on cleaning up hack racks near impound lot 
-  * Paint wall behind dining table in Lobby area. (Colleen) +  - left over MakerFair items go to deep storage (Hapto?
-  * Install additional security cameras. (Tony if he feels like it and if we have them+  - More work needed on the compressed air dryer (See Markus or Tom G.) 
-  * Install additional lights in Vault hallway (brought in by Matt Melk).(We need an electrician I suppose.)    +  - Drain the compressor hoses 
-  * Clean Up and organize the paint room and discuss how it will be revamped+  - Scrub the sinks in the mud room. 
-  * Complete Southwest door lock projectInstall press bar to disable unlocking mechanism   +  - Clear off stuff of little usefulness from Up For Grabs Table.(Geoff Lhas been doing this.)  
-  * Mount racks for gas tanks along outside of welding shop wall?  +  - __Areas that need TLC this Month__:???? Meeting room carpet! Meeting room carpet! Meeting room carpet! 
-  * Inventory storage, find lapsed storage still in use (Ongoing for Operations Director)  +  - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below)  
-  {{:miscellaneous:lenox-fireextinguishers.pdf|Monthly life-safety inspections check list}} (and update the page [[miscellaneous:maintenance|here]]) +  {{:miscellaneous:lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:maintenance|here]])<- The highlighted pdf. is found here as well.(Joe Tomich)  
-  Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]]) +  Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]])  
-  * Replace wash sink water filters (and update the page [[miscellaneous:maintenance|here]]) +  - Parking Ticket MMS projects in East Room. 
-  * Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]]) +  - Red ticket abandoned projects in East Room. 
-  * Replace wood shop air filters (ongoing) +  - Check paper towel stock 
-  * Look at electric strikeplate on the front door. Repair and/or order replacement (The BOD has already appropriated funds if this is needed) +  - Check soap dispensers for bacterial growth, clean them with bleach water if necessary, and fill them with soap solution.  
-  Clean Up and organize the Cafe' shelves after March SID.  +  - Sort through tall storage 
-  * Revamp the Cafe area and build a large rolling island with cabinets below for storage(See Kyle).+  - Make sure parking permit/ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/tickets. 
 +  - Clean out vacuum cleaner filters 
 +  - Clean the Cafe area at the end of the day after the feast(Perfect job for a late comer.) 
 +  - Laser cut small signs for the cafe' cabinets(Steve P.)(Kathy Hneeds to provide a list of the signs needed.)  
 +  - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) 
  
 +**See if any of the following need replacing**
 +  - Replace wash sink water filters (and update the page [[miscellaneous:maintenance|here]])
 +  - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])
 +  - Replace wood shop air filters (ongoing) 
 +  - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged  
 +  - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.)
 +===== Standing To-Do/Space Improvement Day Items =====
 +==== General ====
 +  - See [[miscellaneous:maintenance|Misc Maintenance]]
 +  - Replace burned out bulbs
 +  - Wash off meeting room tables
 +  - Vacuum carpeted areas
 +  - Organize Hack Racks
 +  - Sweep Hallways
 +  - Clean bathrooms
 +  - Inventory member storage against a printout of the wiki, then crosscheck that with active member list (Board member needed for this) so we can clear off empty spaces.
 +  - Clean out Refrigerator and remove living biological experiments at Lenox and Norwich. 
 +
 +==== Quick and/or Easy Tasks ====
 +
 +**General**
 +  - Organize hand Tools
 +  - Empty vacuum cleaners and clean the filter
 +  - Clean table surfaces
 +  - Coil up loose cables and hoses
 +  - Use the push sweeper in the east and west room
 +  - Replace paper towel rolls
 +  - Collect measuring tapes from around the space and put them back
 +  - Check parking permits for expiration and write "Ticket" on the ones that are expired
 +  - Add parking tickets to obviously out-of-place items
 +  - Move items/carts/tables out of aisles
 +  - Make sure the emergency phones are plugged in, charging, and operational
  
 ==== Website ==== ==== Website ====
-  Several pages on our website receive an relatively large amount of traffic, but are not updated +  Several pages on our website receive an relatively large amount of traffic, but are not updated 
-    Update photos [[http://milwaukeemakerspace.org/galleries/nggallery/all/available-equipment/|HERE]] with new ones already taken and on Makervault +    Update photos [[http://milwaukeemakerspace.org/galleries/nggallery/all/available-equipment/|HERE]] with new ones already taken and on Makervault 
-    Take photos from existing blog posts, and add them to the gallery here    [[http://milwaukeemakerspace.org/galleries/nggallery/all/projects/|HERE]] +    Take photos from existing blog posts, and add them to the gallery here    [[http://milwaukeemakerspace.org/galleries/nggallery/all/projects/|HERE]] 
-  Make a blog post about your recent project!+  Make a blog post about your recent project!
    
-==== Outdoors ==== 
-  * Alley lights - Need volunteers, See Tom G.  
-  * Parking sign for Building - electronic (still desired? 
-  * Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted. (See Tom G.) 
-  * Paint new brick work outside the building by the welding and paint booth vents. 
-  * Repair broken bricks & tuckpointing around the outside of the building. 
- 
 ==== Tool/Equipment Related ==== ==== Tool/Equipment Related ====
 +  - Move vacuum former to Lenox
 ==== Building/Infrastructure ==== ==== Building/Infrastructure ====
-  * Air compressor drain system connect the dryer drain to the big tank. (Has this been done?) +  - Finishing touches on craft lab floor (Faith?) 
-  * Automatic gas control for the TIG welder and reminder light that the gas is still on for both welders - See Tom G. +[[spaceprojs:completedprojects|Completed Projects]]
-  * Get an ice maker working in one of the refrigerators (kegerator has one) +
-  * Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle. +
-  * Access control system at Vault entrance - Royce P. +
-  * Paint new brick work inside the vault hall +
-  * Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J. +
-  * Fix the louvers on the weld shop fan so they close correctly. - Dan J. +
-  +
- +
- +
-===== Standing To-Do/Cleanup Day Items ===== +
-==== General ==== +
-  * See [[miscellaneous:maintenance|Misc Maintenance]] +
-  * Replace burned out bulbs +
-  * Wash off meeting room tables +
-  * Clean out ashtray next to alley door +
-  * Crush Aluminum cans in Recycling bin +
-  * Vacuum carpeted areas +
-  * Organize Hack Racks +
-  * Sort and recycle metals +
-  * Sweep Hallway adjacent to Cooties room +
-  * Sweep Vault Hallway +
-  * Clean bathrooms +
-  * Inventory member storage against a printout of the wiki, then crosscheck that with active member list (Board member needed for this) so we can clear off empty spaces. (Ongoing by Kathy H.) +
- +
-==== Laser Lab ====  +
-  * Vacuum inside cutters +
-  * Clean all lenses and mirrors +
-  * Clean and graphite Z-axis elevator screws +
-  * Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces +
- +
-===== Completed Projects ===== +
- +
-  * <del>Complete new storage plan. </del>  Finished by David Draeger and a team of members +
-  * <del>Outlet for the pinball machine and door bell - get rid of the extension cords </del> Tom G. +
-  * <del>Install new Wood shop dust collection system.</del> (Done in 2017) +
-  * <del>Remove the old buckets of Silk screening paint.</del> Tony & Kyle did this.   +
-  * <del>Clean and organize top shelf of hardware bins in Metal Shop.(Started by Rik S.)</del> +
-  * <del>Network cables run to New 3D Lab (Completed by Tony W., Marcin, Mark, Eric)</del>  +
-  * <del>3D Printing moves to Willies old boat area.</del>  +
-  * <del>Black Shelves from Ladies coat room goes into old 3D area.</del> +
-  * <del>White shelves from Cooties room go into Ladies coat room.</del> +
-  * <del>Cosplay Group moves into former Cooties room.</del>  +
-  * <del>Batteries replaced in vault hallway thermostat</del> (Steve Pilon 11/11/17) +
-  * <del>Install awnings over the outside doors.  (Rik Stardy, Marcin Polewski, Steffanie Maher, and Dan Jonke. Completed 11/5/2017</del> +
-  * <del>Replace Batteries in some of the clocks</del> +
-  * <del>Projection system needs a new VGA HDMI</del>  +
-  * <del>Clear out open area in East Room for Maker Faire projects</del>  +
-  * <del>Get Impound lot ready for raffle in July. (Photos & numbers)</del>  +
-  * <del>Install an automatic drain on the big tank.- See Tom G</del>+
-  * <del>Install new water cooler- Timothy Campbell did this! </del>  +
-  * <del>Permanent charging station for the forklift.</del> +
-  * <del>Replace gasket/diaphragm in the self-filling water cooler</del> +
-  * <del>Come up with scrap metal bins to hold small pieces so they don't spill everywhere.</del> +
-  * <del>Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws.</del>  +
-  * <del>Mount a good grinder in the welding area for sharpening TIG electrodes.</del> +
-  * <del>Pinball machine repairs, a never ending project</del> +
-  * <del>Mount 911 phones by exit doors</del> - See Adrian  +
-  * <del>Remove manual lock/unlock from alley doors</del>  +
-  * <del>Fix numeric pad on Door 1</del> - Royce did this! +
-  * <del>Level CNC plasma table</del> - Marc and helpers did this! +
-  * <del>Install new pallet racking for member storage shelves</del> - Lots of people helped with this +
-  * <del>Make "Park on SAME/OPPOSITE" signs for posting outside on meeting nights</del> - Keith did this +
-  * <del>** FIX FLASHING**</del> - Rick did this! +
-  * <del>**Check on auto-filling water cooler leak **</del> +
-  * <del>Remove large format printer</del> +
-  * <del>Reorganize the area around the vacuum former, to allow it to be used</del> +
-  * <del>Mount the cork board by the desk in the lobby</del> +
-  * <del>Some attention should be paid to the small sand blaster window, to see if we can make it more usable</del>     +
-  * <del>Power column for the conference table in the meeting room - See Tom G. and Adrian V.</del>  +
-   * <del>SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.</del> +
-  * <del>Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router. </del> +
-  * <del>Do something with the VLAT.</del> +
-  * <del>Remove the old heater above the back hall from the craft shop so we can hang new lights</del> +
-  * <del>Hang new lights in the craft shop hall.</del> +
-  * <del>Move the exhaust fan for the laser cutters and duct it.</del> +
-  * <del>Gas line for the forge and furnace - Tom, Dan J.</del> +
-  * <del>Outlets on the columns in the East room - Tom</del> +
-  * <del>Paint exterior door frames where the new doors were installed.  Caulk when done. - Dan J., ?</del> +
-  * <del>Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. - Ed, ?</del> +
-  * <del>Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving.</del> - Made redundant by bollard installation. +
-  * <del>Hang speakers in West Room - Kevin B., Dan J.</del> +
-  * <del>Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard. - Vishal, ChrisH, JimR, others</del> +
-  * <del>Power the dust collector in the wood shop -  Tom G</del> +
-  * <del>Install Air Lines - Joe R. and Chris H. </del> +
-  * <del>Clean out Vault 1 and make rentable - Tiffany, Sean</del> +
-  * <del>Organize plotters and screen printing and pottery areas - SteveP, Brant, Pete, DL, others</del> +
-  * <del>Move shelving into vault hallway - Tiffany, Sean, Brant, etc.</del> +
-  * <del>Find a home for the bar -</del> Meh, good enough for now +
-  * <del>Hang mirror over wash sink - Brant</del> +
-  * <del>Replace the light socket on the vertical band saw.</del> +
-  * <del>Fix the 25W laser - find out if its the tube or the power supply.</del> +
-  * <del>Power up the 3 headed drill press (only 2 heads left)</del> +
-  * <del>Tool pegboard - make something to hold pliers and Allen keys better.</del> +
-  * <del>Wash the carpet - try to get out some of the water stains.</del> +
-  * <del>PA system/phones</del> - Chris H. (done) +
-  * <del>'No paper towels in toilets' sign or stencil for bathrooms - Brant, low priority</del> +
-  * <del>Wire Speakers in West Room - Kevin B., Dan J.</del> (some wired up) +
-  *<del> Permanent wiring for the Red Dragon - #6 wire and conduit to a panel with open breakers - Tom G.</del> +
-  *<del> Permanent air lines for the red dragon - flex air lines - See Tom G></del> +
-  <del>* Install the doors with windows:  2 in the south wall of the electronics lab and one between the east room and vestibule.</del> +
-  * <del> Exhaust fan and hood for the pottery area  - See Tom G. or Brant H.</del> +
  
 [[miscellaneous:oldtodolist|To Do List, abandoned 10/11/13, last updated 08/09/13]]\\ [[miscellaneous:oldtodolist|To Do List, abandoned 10/11/13, last updated 08/09/13]]\\
 [[miscellaneous:lenoxtodo|To Do List, from moving into Lenox]]\\ [[miscellaneous:lenoxtodo|To Do List, from moving into Lenox]]\\
spaceprojs.1527365556.txt.gz · Last modified: 2018/05/26 20:12 by kathughett