spaceprojs [2018/05/26 20:12] kathughett [Punch List for May 2018] |
spaceprojs [2022/12/16 18:12] (current) wildapricot-schultz_hannah [Punch List for Saturday, December 17th 2022] |
===== Current To Do List ===== | ===== Current To Do List ===== |
| |
==== Punch List for May 2018 ==== | ==== Punch List for Saturday, December 17th 2022 ==== |
* **Scrap to Cash** (See Tom G.) | - **First thing** - Vacuum meeting room so that the dust can settle before we do the second thing. |
* First thing,vacuum cafe area and meeting room. | - **Second thing** - Mop Cafe floor and Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. |
* Second thing, Sanitize cafe tables and meeting room tables. | - Vacuum the carpeted areas. |
* Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color) | - **Clean out the Toaster, Toaster Oven, and Microwave.** |
* See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | - **SUPER IMPORTANT**: Clean out the ceiling ventilation filter in the Woodshop. |
* Put up "Third Wall" in the Impound Lot. (Kyle W. and Erich Z.) | - put items on pallet in East room on hack racks or up for grabs |
* Put edging around large table in Craft Lab. (Colleen) | - focus on cleaning up hack racks near impound lot |
* Paint wall behind dining table in Lobby area. (Colleen) | - left over MakerFair items go to deep storage (Hapto?) |
* Install additional security cameras. (Tony if he feels like it and if we have them) | - More work needed on the compressed air dryer (See Markus or Tom G.) |
* Install additional lights in Vault hallway (brought in by Matt Melk).(We need an electrician I suppose.) | - Drain the compressor hoses |
* Clean Up and organize the paint room and discuss how it will be revamped. | - Scrub the sinks in the mud room. |
* Complete Southwest door lock project. Install press bar to disable unlocking mechanism. | - Clear off stuff of little usefulness from Up For Grabs Table.(Geoff L. has been doing this.) |
* Mount racks for gas tanks along outside of welding shop wall? | - __Areas that need TLC this Month__:???? Meeting room carpet! Meeting room carpet! Meeting room carpet! |
* Inventory storage, find lapsed storage still in use (Ongoing for Operations Director) | - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) |
* {{:miscellaneous:lenox-fireextinguishers.pdf|Monthly life-safety inspections check list}} (and update the page [[miscellaneous:maintenance|here]]) | - {{:miscellaneous:lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:maintenance|here]])<- The highlighted pdf. is found here as well.(Joe Tomich) |
* Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]]) | - Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]]) |
* Replace wash sink water filters (and update the page [[miscellaneous:maintenance|here]]) | - Parking Ticket MMS projects in East Room. |
* Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]]) | - Red ticket abandoned projects in East Room. |
* Replace wood shop air filters (ongoing) | - Check paper towel stock |
* Look at electric strikeplate on the front door. Repair and/or order replacement (The BOD has already appropriated funds if this is needed) | - Check soap dispensers for bacterial growth, clean them with bleach water if necessary, and fill them with soap solution. |
* Clean Up and organize the Cafe' shelves after March SID. | - Sort through tall storage |
* Revamp the Cafe area and build a large rolling island with cabinets below for storage(See Kyle). | - Make sure parking permit/ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/tickets. |
| - Clean out vacuum cleaner filters |
| - Clean the Cafe area at the end of the day after the feast. (Perfect job for a late comer.) |
| - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) |
| - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) |
| |
| **See if any of the following need replacing** |
| - Replace wash sink water filters (and update the page [[miscellaneous:maintenance|here]]) |
| - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]]) |
| - Replace wood shop air filters (ongoing) |
| - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged |
| - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) |
| ===== Standing To-Do/Space Improvement Day Items ===== |
| ==== General ==== |
| - See [[miscellaneous:maintenance|Misc Maintenance]] |
| - Replace burned out bulbs |
| - Wash off meeting room tables |
| - Vacuum carpeted areas |
| - Organize Hack Racks |
| - Sweep Hallways |
| - Clean bathrooms |
| - Inventory member storage against a printout of the wiki, then crosscheck that with active member list (Board member needed for this) so we can clear off empty spaces. |
| - Clean out Refrigerator and remove living biological experiments at Lenox and Norwich. |
| |
| ==== Quick and/or Easy Tasks ==== |
| |
| **General** |
| - Organize hand Tools |
| - Empty vacuum cleaners and clean the filter |
| - Clean table surfaces |
| - Coil up loose cables and hoses |
| - Use the push sweeper in the east and west room |
| - Replace paper towel rolls |
| - Collect measuring tapes from around the space and put them back |
| - Check parking permits for expiration and write "Ticket" on the ones that are expired |
| - Add parking tickets to obviously out-of-place items |
| - Move items/carts/tables out of aisles |
| - Make sure the emergency phones are plugged in, charging, and operational |
| |
==== Website ==== | ==== Website ==== |
* Several pages on our website receive an relatively large amount of traffic, but are not updated | - Several pages on our website receive an relatively large amount of traffic, but are not updated |
* Update photos [[http://milwaukeemakerspace.org/galleries/nggallery/all/available-equipment/|HERE]] with new ones already taken and on Makervault | - Update photos [[http://milwaukeemakerspace.org/galleries/nggallery/all/available-equipment/|HERE]] with new ones already taken and on Makervault |
* Take photos from existing blog posts, and add them to the gallery here [[http://milwaukeemakerspace.org/galleries/nggallery/all/projects/|HERE]] | - Take photos from existing blog posts, and add them to the gallery here [[http://milwaukeemakerspace.org/galleries/nggallery/all/projects/|HERE]] |
* Make a blog post about your recent project! | - Make a blog post about your recent project! |
| |
==== Outdoors ==== | |
* Alley lights - Need volunteers, See Tom G. | |
* Parking sign for Building - electronic (still desired?) | |
* Finish the exterior south east entrance (vault hall). The ceiling panels door need to be caulked and painted. (See Tom G.) | |
* Paint new brick work outside the building by the welding and paint booth vents. | |
* Repair broken bricks & tuckpointing around the outside of the building. | |
| |
==== Tool/Equipment Related ==== | ==== Tool/Equipment Related ==== |
| - Move vacuum former to Lenox |
==== Building/Infrastructure ==== | ==== Building/Infrastructure ==== |
* Air compressor drain system - connect the dryer drain to the big tank. (Has this been done?) | - Finishing touches on craft lab floor (Faith?) |
* Automatic gas control for the TIG welder and reminder light that the gas is still on for both welders - See Tom G. | [[spaceprojs:completedprojects|Completed Projects]] |
* Get an ice maker working in one of the refrigerators (kegerator has one) | |
* Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle. | |
* Access control system at Vault entrance - Royce P. | |
* Paint new brick work inside the vault hall | |
* Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J. | |
* Fix the louvers on the weld shop fan so they close correctly. - Dan J. | |
| |
| |
| |
===== Standing To-Do/Cleanup Day Items ===== | |
==== General ==== | |
* See [[miscellaneous:maintenance|Misc Maintenance]] | |
* Replace burned out bulbs | |
* Wash off meeting room tables | |
* Clean out ashtray next to alley door | |
* Crush Aluminum cans in Recycling bin | |
* Vacuum carpeted areas | |
* Organize Hack Racks | |
* Sort and recycle metals | |
* Sweep Hallway adjacent to Cooties room | |
* Sweep Vault Hallway | |
* Clean bathrooms | |
* Inventory member storage against a printout of the wiki, then crosscheck that with active member list (Board member needed for this) so we can clear off empty spaces. (Ongoing by Kathy H.) | |
| |
==== Laser Lab ==== | |
* Vacuum inside cutters | |
* Clean all lenses and mirrors | |
* Clean and graphite Z-axis elevator screws | |
* Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces | |
| |
===== Completed Projects ===== | |
| |
* <del>Complete new storage plan. </del> Finished by David Draeger and a team of members | |
* <del>Outlet for the pinball machine and door bell - get rid of the extension cords </del> Tom G. | |
* <del>Install new Wood shop dust collection system.</del> (Done in 2017) | |
* <del>Remove the old buckets of Silk screening paint.</del> Tony & Kyle did this. | |
* <del>Clean and organize top shelf of hardware bins in Metal Shop.(Started by Rik S.)</del> | |
* <del>Network cables run to New 3D Lab (Completed by Tony W., Marcin, Mark, Eric)</del> | |
* <del>3D Printing moves to Willies old boat area.</del> | |
* <del>Black Shelves from Ladies coat room goes into old 3D area.</del> | |
* <del>White shelves from Cooties room go into Ladies coat room.</del> | |
* <del>Cosplay Group moves into former Cooties room.</del> | |
* <del>Batteries replaced in vault hallway thermostat</del> (Steve Pilon 11/11/17) | |
* <del>Install awnings over the outside doors. (Rik Stardy, Marcin Polewski, Steffanie Maher, and Dan Jonke. Completed 11/5/2017</del> | |
* <del>Replace Batteries in some of the clocks</del> | |
* <del>Projection system needs a new VGA HDMI</del> | |
* <del>Clear out open area in East Room for Maker Faire projects</del> | |
* <del>Get Impound lot ready for raffle in July. (Photos & numbers)</del> | |
* <del>Install an automatic drain on the big tank.- See Tom G</del> . | |
* <del>Install new water cooler- Timothy Campbell did this! </del> | |
* <del>Permanent charging station for the forklift.</del> | |
* <del>Replace gasket/diaphragm in the self-filling water cooler</del> | |
* <del>Come up with scrap metal bins to hold small pieces so they don't spill everywhere.</del> | |
* <del>Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws.</del> | |
* <del>Mount a good grinder in the welding area for sharpening TIG electrodes.</del> | |
* <del>Pinball machine repairs, a never ending project</del> | |
* <del>Mount 911 phones by exit doors</del> - See Adrian | |
* <del>Remove manual lock/unlock from alley doors</del> | |
* <del>Fix numeric pad on Door 1</del> - Royce did this! | |
* <del>Level CNC plasma table</del> - Marc and helpers did this! | |
* <del>Install new pallet racking for member storage shelves</del> - Lots of people helped with this | |
* <del>Make "Park on SAME/OPPOSITE" signs for posting outside on meeting nights</del> - Keith did this | |
* <del>** FIX FLASHING**</del> - Rick did this! | |
* <del>**Check on auto-filling water cooler leak **</del> | |
* <del>Remove large format printer</del> | |
* <del>Reorganize the area around the vacuum former, to allow it to be used</del> | |
* <del>Mount the cork board by the desk in the lobby</del> | |
* <del>Some attention should be paid to the small sand blaster window, to see if we can make it more usable</del> | |
* <del>Power column for the conference table in the meeting room - See Tom G. and Adrian V.</del> | |
* <del>SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.</del> | |
* <del>Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router. </del> | |
* <del>Do something with the VLAT.</del> | |
* <del>Remove the old heater above the back hall from the craft shop so we can hang new lights</del> | |
* <del>Hang new lights in the craft shop hall.</del> | |
* <del>Move the exhaust fan for the laser cutters and duct it.</del> | |
* <del>Gas line for the forge and furnace - Tom, Dan J.</del> | |
* <del>Outlets on the columns in the East room - Tom</del> | |
* <del>Paint exterior door frames where the new doors were installed. Caulk when done. - Dan J., ?</del> | |
* <del>Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. - Ed, ?</del> | |
* <del>Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving.</del> - Made redundant by bollard installation. | |
* <del>Hang speakers in West Room - Kevin B., Dan J.</del> | |
* <del>Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard. - Vishal, ChrisH, JimR, others</del> | |
* <del>Power the dust collector in the wood shop - Tom G</del> | |
* <del>Install Air Lines - Joe R. and Chris H. </del> | |
* <del>Clean out Vault 1 and make rentable - Tiffany, Sean</del> | |
* <del>Organize plotters and screen printing and pottery areas - SteveP, Brant, Pete, DL, others</del> | |
* <del>Move shelving into vault hallway - Tiffany, Sean, Brant, etc.</del> | |
* <del>Find a home for the bar -</del> Meh, good enough for now | |
* <del>Hang mirror over wash sink - Brant</del> | |
* <del>Replace the light socket on the vertical band saw.</del> | |
* <del>Fix the 25W laser - find out if its the tube or the power supply.</del> | |
* <del>Power up the 3 headed drill press (only 2 heads left)</del> | |
* <del>Tool pegboard - make something to hold pliers and Allen keys better.</del> | |
* <del>Wash the carpet - try to get out some of the water stains.</del> | |
* <del>PA system/phones</del> - Chris H. (done) | |
* <del>'No paper towels in toilets' sign or stencil for bathrooms - Brant, low priority</del> | |
* <del>Wire Speakers in West Room - Kevin B., Dan J.</del> (some wired up) | |
*<del> Permanent wiring for the Red Dragon - #6 wire and conduit to a panel with open breakers - Tom G.</del> | |
*<del> Permanent air lines for the red dragon - flex air lines - See Tom G></del> | |
<del>* Install the doors with windows: 2 in the south wall of the electronics lab and one between the east room and vestibule.</del> | |
* <del> Exhaust fan and hood for the pottery area - See Tom G. or Brant H.</del> | |
| |
[[miscellaneous:oldtodolist|To Do List, abandoned 10/11/13, last updated 08/09/13]]\\ | [[miscellaneous:oldtodolist|To Do List, abandoned 10/11/13, last updated 08/09/13]]\\ |
[[miscellaneous:lenoxtodo|To Do List, from moving into Lenox]]\\ | [[miscellaneous:lenoxtodo|To Do List, from moving into Lenox]]\\ |