User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
spaceprojs [2020/01/28 20:13]
kathughett
spaceprojs [2020/02/11 00:51]
kathughett [Outdoors]
Line 13: Line 13:
   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.
   - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus)   - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus)
-  - Reorganize Laser lab hack rack after its moved back in to the room+  - Update First Aid Kits
   - Reorganize Cosplay Room for easier access to power outlets.   - Reorganize Cosplay Room for easier access to power outlets.
   - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged     - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged  
Line 113: Line 113:
   - Alley lights - Need volunteers, See Tom G.    - Alley lights - Need volunteers, See Tom G. 
   - Install Outdoor Lights on east side of building.(Mike T.)   - Install Outdoor Lights on east side of building.(Mike T.)
 +  - Paint parking lines on building.
 +  - Put Compact Cars Only signs on MMS building across from neighbors' garage.
   - Parking sign for Building - electronic (still desired?   - Parking sign for Building - electronic (still desired?
   - Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted. (See Tom G.)   - Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted. (See Tom G.)
spaceprojs.txt · Last modified: 2022/12/16 18:12 by wildapricot-schultz_hannah