spaceprojs [2020/01/17 02:26]
kathughett
spaceprojs [2020/03/28 23:07]
wildapricot-schneider_markus [Punch List for Sunday, March 29, 2020]
Line 9: Line 9:
 ===== Current To Do List =====  ===== Current To Do List ===== 
        
-==== Punch List for Sat. ???ember %%2019 ==== +==== Punch List for Sunday, March 292020 ==== 
-  - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing.  +  - **First thing** - Vacuum meeting room so that the dust can settle before we do the second thing.  
-  - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. +  - **Second thing** - Mop Cafe floor and Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. 
-  - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus) +  - Rewire Light Switch in Paint Room (see Markus for further info
-  - Reorganize Laser lab hack rack after its moved back in to the room +  - replace faucets in womens rest room. Replace wax seal in far stall (see Markus) 
-  - Reorganize Cosplay Room for easier access to power outlets+  - Update First Aid Kits 
-  - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged   +  - Vacuum the carpeted areas.  
-  - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance(It's a dusty maroon color)  +
   - **Clean out the Toaster, Toaster Oven, and Microwave.**   - **Clean out the Toaster, Toaster Oven, and Microwave.**
   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.
   - More work needed on the compressed air dryer (See Markus or Tom G.)   - More work needed on the compressed air dryer (See Markus or Tom G.)
   - Drain the compressor hoses   - Drain the compressor hoses
-  - Design and build a cabinet for storing safety goggles.  
   - Scrub the sinks in the mud room.   - Scrub the sinks in the mud room.
-  - Hang Sarah's art installation in the East room.(If she has it available.)  +  - Clear off stuff of little usefulness from Up For Grabs Table.(Geoff L. has been doing this.)  
-  - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) +  - __Areas that need TLC this Month__:???? Meeting room carpet! Meeting room carpet! Meeting room carpet!
-  - Clear off stuff of little usefulness from Up For Grabs Table.  +
-  - __Areas that need TLC this Month__: Hack Rack in Laser Lab,+
   - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below)    - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) 
   - {{:miscellaneous:lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:maintenance|here]])<- The highlighted pdf. is found here as well.(Joe Tomich)    - {{:miscellaneous:lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:maintenance|here]])<- The highlighted pdf. is found here as well.(Joe Tomich) 
-  - Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]])  +  - Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]])  
 +  - Parking Ticket MMS projects in East Room.
   - Red ticket abandoned projects in East Room.   - Red ticket abandoned projects in East Room.
   - Check paper towel stock   - Check paper towel stock
Line 36: Line 33:
   - Make sure parking permit/ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/tickets.   - Make sure parking permit/ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/tickets.
   - Clean out vacuum cleaner filters   - Clean out vacuum cleaner filters
-  - Clean the Cafe area at the end of the day after the feast+  - Clean the Cafe area at the end of the day after the feast. (Perfect job for a late comer.)
   - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.)    - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) 
   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director)    - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) 
Line 43: Line 40:
   - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])   - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])
   - Replace wood shop air filters (ongoing)    - Replace wood shop air filters (ongoing) 
-  - Jack Hammer apart the old Dumpster Pad in spring.+  - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged   
 +  - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.)
   -    - 
  
Line 82: Line 80:
  
 **Craft lab** **Craft lab**
 +  - Dust off tables, displays, and cabinets
   -    - 
      
Line 107: Line 106:
    
 ==== Outdoors ====  ==== Outdoors ==== 
 +  - Jack Hammer apart the old Dumpster Pad in spring.
   - Alley lights - Need volunteers, See Tom G.    - Alley lights - Need volunteers, See Tom G. 
   - Install Outdoor Lights on east side of building.(Mike T.)   - Install Outdoor Lights on east side of building.(Mike T.)
 +  - Paint parking lines on building.
 +  - Put Compact Cars Only signs on MMS building across from neighbors' garage.
   - Parking sign for Building - electronic (still desired?   - Parking sign for Building - electronic (still desired?
   - Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted. (See Tom G.)   - Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted. (See Tom G.)
Line 130: Line 132:
  
 ===== Completed Projects ===== ===== Completed Projects =====
-  - <del>+  - <del>Design and build a cabinet for storing safety goggles.  
 +  - <del>- Install a longer hose for the water cooler.  
 +  - <del>- Shift over the fridges into their permanent position.(Many guys did this.) 
 +  - <del>- LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (completed by Sallie  & Kevin Draper, Tony W., & Markus )
   - <del>- **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area   - <del>- **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area
   - <del>- **FIX LIGHT FIXTURE IN CERAMICS VAULT**</del> Jeff M. did it   - <del>- **FIX LIGHT FIXTURE IN CERAMICS VAULT**</del> Jeff M. did it