spaceprojs [2019/11/26 03:14]
kathughett
spaceprojs [2020/01/19 18:44]
kathughett
Line 9: Line 9:
 ===== Current To Do List =====  ===== Current To Do List ===== 
        
-==== Punch List for Sat. ???ember %%2019 ====+==== Punch List for Sunday January 192020 ====
   - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing.    - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing. 
   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.
   - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus)   - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus)
   - Reorganize Laser lab hack rack after its moved back in to the room   - Reorganize Laser lab hack rack after its moved back in to the room
 +  - Reorganize Cosplay Room for easier access to power outlets.
   - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged     - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged  
-  - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance(It's a dusty maroon color)  +  - Vacuum the carpeted areas.  
   - **Clean out the Toaster, Toaster Oven, and Microwave.**   - **Clean out the Toaster, Toaster Oven, and Microwave.**
   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.
Line 42: Line 43:
   - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])   - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])
   - Replace wood shop air filters (ongoing)    - Replace wood shop air filters (ongoing) 
-  - Jack Hammer apart the old Dumpster Pad in spring. 
   -    - 
  
Line 81: Line 81:
  
 **Craft lab** **Craft lab**
 +  - Clean out piles of stuff under the Pinball Machine
 +  - Dust off tables, displays, and cabinets
   -    - 
      
Line 106: Line 108:
    
 ==== Outdoors ====  ==== Outdoors ==== 
 +  - Jack Hammer apart the old Dumpster Pad in spring.
   - Alley lights - Need volunteers, See Tom G.    - Alley lights - Need volunteers, See Tom G. 
   - Install Outdoor Lights on east side of building.(Mike T.)   - Install Outdoor Lights on east side of building.(Mike T.)