This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
spaceprojs [2019/11/21 20:45] kathughett |
spaceprojs [2020/03/28 23:00] wildapricot-schneider_markus [Punch List for Sunday, March 29, 2020] |
||
---|---|---|---|
Line 9: | Line 9: | ||
===== Current To Do List ===== | ===== Current To Do List ===== | ||
- | ==== Punch List for Sat. November 23, 2019 ==== | + | ==== Punch List for Sunday, March 29, 2020 ==== |
- | - **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area | + | - **First thing** - Vacuum meeting room so that the dust can settle before we do the second thing. |
- | - **First thing** - Vacuum | + | - **Second thing** - Mop Cafe floor and Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. |
- | - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. | + | - Rewire Light Switch |
- | - LARGE PROJECT Replace the damaged carpet flooring | + | - replace faucets |
- | - Reorganize Laser lab hack rack after its moved back in to the room | + | - Update First Aid Kits |
- | - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/ | + | - Vacuum |
- | - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color) | + | |
- **Clean out the Toaster, Toaster Oven, and Microwave.** | - **Clean out the Toaster, Toaster Oven, and Microwave.** | ||
- SUPERIMPORTANT: | - SUPERIMPORTANT: | ||
- More work needed on the compressed air dryer (See Markus or Tom G.) | - More work needed on the compressed air dryer (See Markus or Tom G.) | ||
- | - There are storage shelves need to have items moved to IMPOUND, VB102-Wilhelm, | + | - Drain the compressor hoses |
- | - Design and build a cabinet for storing safety goggles. | + | |
- Scrub the sinks in the mud room. | - Scrub the sinks in the mud room. | ||
- | | + | - Clear off stuff of little usefulness from Up For Grabs Table.(Geoff L. has been doing this.) |
- | - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) | + | - __Areas that need TLC this Month__:???? |
- | | + | |
- | - __Areas that need TLC__: Craft lab counter, Hack Rack in Laser Lab, Paint Room | + | |
- If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | ||
- | - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | ||
- {{: | - {{: | ||
- | - Check and restock first-aid kits, (and update the page [[miscellaneous: | + | - Check and restock first-aid kits, (and update the page [[miscellaneous: |
- | - Vacuum Cafe area at the end of the day after the feast. | + | - Parking Ticket MMS projects in East Room. |
- Red ticket abandoned projects in East Room. | - Red ticket abandoned projects in East Room. | ||
- Check paper towel stock | - Check paper towel stock | ||
Line 38: | Line 33: | ||
- Make sure parking permit/ | - Make sure parking permit/ | ||
- Clean out vacuum cleaner filters | - Clean out vacuum cleaner filters | ||
- | - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) | + | |
- | - Jack Hammer apart the old Dumpster Pad in spring. | + | |
- Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | ||
**See if any of the following need replacing** | **See if any of the following need replacing** | ||
Line 45: | Line 40: | ||
- Replace furnace filters if needed (and update the page [[miscellaneous: | - Replace furnace filters if needed (and update the page [[miscellaneous: | ||
- Replace wood shop air filters (ongoing) | - Replace wood shop air filters (ongoing) | ||
+ | - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/ | ||
+ | - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) | ||
+ | - | ||
===== Standing To-Do/ | ===== Standing To-Do/ | ||
Line 83: | Line 80: | ||
**Craft lab** | **Craft lab** | ||
+ | - Dust off tables, displays, and cabinets | ||
- | - | ||
| | ||
Line 108: | Line 106: | ||
==== Outdoors ==== | ==== Outdoors ==== | ||
+ | - Jack Hammer apart the old Dumpster Pad in spring. | ||
- Alley lights - Need volunteers, See Tom G. | - Alley lights - Need volunteers, See Tom G. | ||
- Install Outdoor Lights on east side of building.(Mike T.) | - Install Outdoor Lights on east side of building.(Mike T.) | ||
+ | - Paint parking lines on building. | ||
+ | - Put Compact Cars Only signs on MMS building across from neighbors' | ||
- Parking sign for Building - electronic (still desired? | - Parking sign for Building - electronic (still desired? | ||
- Finish the exterior south east entrance (vault hall). | - Finish the exterior south east entrance (vault hall). | ||
Line 131: | Line 132: | ||
===== Completed Projects ===== | ===== Completed Projects ===== | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
- < | - < | ||
- < | - < |