 ===== Current To Do List =====  ===== Current To Do List ===== 
        
-==== Punch List for Sat. November 232019 ==== +==== Punch List for Sunday January 192020 ====
-  - **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area+
   - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing.    - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing. 
   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.   - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up.
   - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus)   - LARGE PROJECT Replace the damaged carpet flooring in the laser lab with luxury vinyl planking (see Markus)
   - Reorganize Laser lab hack rack after its moved back in to the room   - Reorganize Laser lab hack rack after its moved back in to the room
 +  - Reorganize Cosplay Room for easier access to power outlets.
   - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged     - Go through all the space carts and check for damaged wheels and the like. Look at replacement tires/wheels and mark as damaged  
-  - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance(It's a dusty maroon color)  +  - Vacuum the carpeted areas.  
   - **Clean out the Toaster, Toaster Oven, and Microwave.**   - **Clean out the Toaster, Toaster Oven, and Microwave.**
   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.
   - More work needed on the compressed air dryer (See Markus or Tom G.)   - More work needed on the compressed air dryer (See Markus or Tom G.)
-  - There are storage shelves need to have items moved to IMPOUND, VB102-Wilhelm, VD301-Kutzner, VA303-Theiler, VF304-Mondry,(See Kathy H.) **This month the items in the Impound Lot will be disseminated to area champions, the Up-For-Grabs table and the appropriate hack racks.**  +  - Drain the compressor hoses
   - Design and build a cabinet for storing safety goggles.    - Design and build a cabinet for storing safety goggles. 
   - Scrub the sinks in the mud room.   - Scrub the sinks in the mud room.
Line 26: Line 26:
   - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.)   - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.)
   - Clear off stuff of little usefulness from Up For Grabs Table.    - Clear off stuff of little usefulness from Up For Grabs Table. 
-  - __Areas that need TLC__Craft lab counter, Hack Rack in Laser Lab, Paint Room +  - __Areas that need TLC this Month__: Hack Rack in Laser Lab,
   - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below)    - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) 
-  - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. 
   - {{:miscellaneous:lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:maintenance|here]])<- The highlighted pdf. is found here as well.(Joe Tomich)    - {{:miscellaneous:lenox-fire extinguishers.pdf|Monthly life-safety inspections checklist}} (and update the page [[miscellaneous:maintenance|here]])<- The highlighted pdf. is found here as well.(Joe Tomich) 
   - Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]])     - Check and restock first-aid kits, (and update the page [[miscellaneous:maintenance|here]])  
-  - Vacuum Cafe area at the end of the day after the feast.  
   - Red ticket abandoned projects in East Room.   - Red ticket abandoned projects in East Room.
   - Check paper towel stock   - Check paper towel stock
Line 38: Line 36:
   - Make sure parking permit/ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/tickets.   - Make sure parking permit/ticket holders are sufficiently stocked. See IT Tony or Kathy H. for more permits/tickets.
   - Clean out vacuum cleaner filters   - Clean out vacuum cleaner filters
-  - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) +  - Clean the Cafe area at the end of the day after the feast 
-  - Jack Hammer apart the old Dumpster Pad in spring. +  - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) 
   - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director)    - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) 
 **See if any of the following need replacing** **See if any of the following need replacing**
Line 45: Line 43:
   - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])   - Replace furnace filters if needed (and update the page [[miscellaneous:maintenance|here]])
   - Replace wood shop air filters (ongoing)    - Replace wood shop air filters (ongoing) 
 +  - 
  
 ===== Standing To-Do/Cleanup Day Items ===== ===== Standing To-Do/Cleanup Day Items =====
Line 83: Line 81:
  
 **Craft lab** **Craft lab**
 +  - Clean out piles of stuff under the Pinball Machine
 +  - Dust off tables, displays, and cabinets
   -    - 
      
Line 108: Line 108:
    
 ==== Outdoors ====  ==== Outdoors ==== 
 +  - Jack Hammer apart the old Dumpster Pad in spring.
   - Alley lights - Need volunteers, See Tom G.    - Alley lights - Need volunteers, See Tom G. 
   - Install Outdoor Lights on east side of building.(Mike T.)   - Install Outdoor Lights on east side of building.(Mike T.)
Line 131: Line 132:
  
 ===== Completed Projects ===== ===== Completed Projects =====
 +  - <del>
 +  - <del>- **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area
   - <del>- **FIX LIGHT FIXTURE IN CERAMICS VAULT**</del> Jeff M. did it   - <del>- **FIX LIGHT FIXTURE IN CERAMICS VAULT**</del> Jeff M. did it