This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
spaceprojs [2019/11/21 20:45] kathughett |
spaceprojs [2019/11/26 03:14] kathughett |
||
---|---|---|---|
Line 9: | Line 9: | ||
===== Current To Do List ===== | ===== Current To Do List ===== | ||
- | ==== Punch List for Sat. November 23, 2019 ==== | + | ==== Punch List for Sat. ???ember %%, 2019 ==== |
- | - **TOP PRIORITY** - Finish painting the wall and installing the flooring in the Cafe Area | + | |
- **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing. | - **First thing** - Vacuum cafe area and meeting room so that the dust can settle before we do the second thing. | ||
- **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. | - **Second thing** - Sanitize cafe tables and meeting room tables using bleach or vinegar water. These need to be done before the food or any snacks are set up. | ||
Line 20: | Line 19: | ||
- SUPERIMPORTANT: | - SUPERIMPORTANT: | ||
- More work needed on the compressed air dryer (See Markus or Tom G.) | - More work needed on the compressed air dryer (See Markus or Tom G.) | ||
- | - There are storage shelves need to have items moved to IMPOUND, VB102-Wilhelm, | + | - Drain the compressor hoses |
- Design and build a cabinet for storing safety goggles. | - Design and build a cabinet for storing safety goggles. | ||
- Scrub the sinks in the mud room. | - Scrub the sinks in the mud room. | ||
Line 26: | Line 25: | ||
- Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) | - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) | ||
- Clear off stuff of little usefulness from Up For Grabs Table. | - Clear off stuff of little usefulness from Up For Grabs Table. | ||
- | - __Areas that need TLC__: Craft lab counter, | + | - __Areas that need TLC this Month__: Hack Rack in Laser Lab, |
- If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | ||
- | - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | ||
- {{: | - {{: | ||
- Check and restock first-aid kits, (and update the page [[miscellaneous: | - Check and restock first-aid kits, (and update the page [[miscellaneous: | ||
- | - Vacuum Cafe area at the end of the day after the feast. | ||
- Red ticket abandoned projects in East Room. | - Red ticket abandoned projects in East Room. | ||
- Check paper towel stock | - Check paper towel stock | ||
Line 38: | Line 35: | ||
- Make sure parking permit/ | - Make sure parking permit/ | ||
- Clean out vacuum cleaner filters | - Clean out vacuum cleaner filters | ||
- | - Laser cut small signs for the cafe' cabinets. (Steve P.)(Kathy H. needs to provide a list of the signs needed.) | + | |
- | - Jack Hammer apart the old Dumpster Pad in spring. | + | |
- Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | ||
**See if any of the following need replacing** | **See if any of the following need replacing** | ||
Line 45: | Line 42: | ||
- Replace furnace filters if needed (and update the page [[miscellaneous: | - Replace furnace filters if needed (and update the page [[miscellaneous: | ||
- Replace wood shop air filters (ongoing) | - Replace wood shop air filters (ongoing) | ||
+ | - Jack Hammer apart the old Dumpster Pad in spring. | ||
+ | - | ||
===== Standing To-Do/ | ===== Standing To-Do/ | ||
Line 131: | Line 129: | ||
===== Completed Projects ===== | ===== Completed Projects ===== | ||
+ | - < | ||
+ | - < | ||
- < | - < | ||
- < | - < |