User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
spaceprojs [2019/07/02 23:17]
kathughett
spaceprojs [2019/07/13 02:00]
kathughett
Line 16: Line 16:
   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.   - SUPERIMPORTANT: Clean out the ceiling ventilation filter in the Woodshop.
   - More work needed on the compressed air dryer (See Markus or Tom G.)   - More work needed on the compressed air dryer (See Markus or Tom G.)
 +  - Organize and downsize the books in the library and determine what books can be tossed. (Need a long term member and a newer member for this job.) 
   - Revamp the Cafe area floor. (See Kyle)   - Revamp the Cafe area floor. (See Kyle)
   - Scrub the sinks in the mud room.   - Scrub the sinks in the mud room.
Line 33: Line 34:
   - Clean out vacuum cleaner filters   - Clean out vacuum cleaner filters
   - Finish Milwaukee Tools Cabinet   - Finish Milwaukee Tools Cabinet
-  - Organize and downsize the books in the library and determine what books can be tossed. (Need a long term member and a newer member for this job.)  
   - Bring in the large bookcase from next to the Dalek area and replace two smaller bookcases with it after the library has been sorted and downsized.    - Bring in the large bookcase from next to the Dalek area and replace two smaller bookcases with it after the library has been sorted and downsized. 
   - Paint wall in Lobby area. (Project on hold)   - Paint wall in Lobby area. (Project on hold)
spaceprojs.txt · Last modified: 2022/12/16 18:12 by wildapricot-schultz_hannah