spaceprojs [2019/05/28 21:05] kathughett |
spaceprojs [2019/08/13 03:23] kathughett |
||
---|---|---|---|
Line 9: | Line 9: | ||
===== Current To Do List ===== | ===== Current To Do List ===== | ||
- | ==== Punch List for May 2019 (June 2) ==== | + | ==== Punch List for Sat. August 24, 2019 ==== |
- First thing - Vacuum cafe area and meeting room. | - First thing - Vacuum cafe area and meeting room. | ||
- Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up. | - Second thing - Sanitize cafe tables and meeting room tables. These need to be done before the food or any snacks are set up. | ||
- Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color) | - Empty the vacuum cleaners as well as the floor sweeper in the main alley entrance. (It's a dusty maroon color) | ||
- | - Clean out the Toaster, Toaster Oven, and Microwave | + | - Clean out the Toaster, Toaster Oven, and Microwave |
- SUPERIMPORTANT: | - SUPERIMPORTANT: | ||
- More work needed on the compressed air dryer (See Markus or Tom G.) | - More work needed on the compressed air dryer (See Markus or Tom G.) | ||
+ | - Design and build a cabinet for storing safety goggles. | ||
+ | - Organize and downsize the books in the library and determine what books can be tossed. (Need a long term member and a newer member for this job.**See Jon H**.) | ||
- Revamp the Cafe area floor. (See Kyle) | - Revamp the Cafe area floor. (See Kyle) | ||
- | - Move bookcase from cafe to library replacing smaller bookcase. | ||
- | - Make smaller bookcases up for grabs for 1 week. | ||
- | - Replace table in electronics area with a better one from the pallet racks. | ||
- Scrub the sinks in the mud room. | - Scrub the sinks in the mud room. | ||
+ | - Reorganize the Electrical Engineering cart in the Vault Hallway.(Mike T.) | ||
+ | - Clear off stuff of little usefulness from Up For Grabs Table. | ||
+ | - __Areas that need TLC__: Craft lab counter, Hack Rack in Laser Lab, Pottery Area Tool Cabinet | ||
+ | - Sort Fabric Bins in Craft Lab (See Kathy H. for instructions.) | ||
- If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | - If the grill is used during SID assign someone to clean it at the end of the day.(See instructions below) | ||
- See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | ||
- Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | ||
- | - {{: | + | - {{: |
- | - Check and restock first-aid kits, (and update the page [[miscellaneous: | + | - Check and restock first-aid kits, (and update the page [[miscellaneous: |
- | - Replace wash sink water filters (and update the page [[miscellaneous: | + | - Disseminate contents of Impound Lot IF needed.(Facilities Director) |
- | - Replace furnace filters if needed (and update the page [[miscellaneous: | + | |
- | - Replace wood shop air filters (ongoing) | + | |
- | - Disseminate contents of Impound Lot IF needed. | + | |
- Vacuum Cafe area at the end of the day after the feast. | - Vacuum Cafe area at the end of the day after the feast. | ||
- Red ticket abandoned projects in East Room. | - Red ticket abandoned projects in East Room. | ||
- | - Paint the lettering on the big First Aid cabinet in the mud room RED. (Kathy Hughett) | + | - Check paper towel stock |
- | - check paper towel stock | + | - Check soap dispensers for bacterial growth, clean them with bleach water if necessary, and fill them with soap solution. |
- | - sort through tall storage | + | - Sort through tall storage |
- | - make sure parking ticket holders are sufficiently stocked | + | - Make sure parking |
- | - clean out vacuum cleaner filters | + | - Clean out vacuum cleaner filters |
- Finish Milwaukee Tools Cabinet | - Finish Milwaukee Tools Cabinet | ||
+ | - Bring in the large bookcase from next to the Dalek area and replace two smaller bookcases with it after the library has been sorted and downsized. | ||
- Paint wall in Lobby area. (Project on hold) | - Paint wall in Lobby area. (Project on hold) | ||
+ | - See if any of the following need replacing -> | ||
+ | - Replace wash sink water filters (and update the page [[miscellaneous: | ||
+ | - Replace furnace filters if needed (and update the page [[miscellaneous: | ||
+ | - Replace wood shop air filters (ongoing) | ||
===== Standing To-Do/ | ===== Standing To-Do/ | ||
==== General ==== | ==== General ==== | ||
- See [[miscellaneous: | - See [[miscellaneous: | ||
+ | - Sharpen and Sort Drill Bits in Metal Shop (Also check with Woodshop Champion) | ||
- Replace burned out bulbs | - Replace burned out bulbs | ||
- Wash off meeting room tables | - Wash off meeting room tables | ||
- | - Clean out ashtray next to alley door | + | - Clean up cigarette butts in the alley and by the southwest |
- | - Crush Aluminum cans in Recycling bin | + | |
- Vacuum carpeted areas | - Vacuum carpeted areas | ||
- Organize Hack Racks | - Organize Hack Racks | ||
Line 59: | Line 64: | ||
At the end of grilling season view this video for a thorough cleaning of the grill. https:// | At the end of grilling season view this video for a thorough cleaning of the grill. https:// | ||
+ | |||
+ | ==== Quick and/or Easy Tasks ==== | ||
+ | |||
+ | **Electronics lab** | ||
+ | - Re-align the resistor/ | ||
+ | - Make the soldering table look like the photo on the wall above it | ||
+ | - Sort hanging multimeter leads | ||
+ | - Sort tools hanging on the wall | ||
+ | |||
+ | **3D Printing** | ||
+ | - Put tools away in the tray above SoM or on the wire shelf | ||
+ | - Clean off bits of filament from inside / under the printers | ||
+ | - Put the spools back in the proper container | ||
+ | - Wipe off the desks | ||
+ | - Sweep the floor | ||
+ | |||
+ | **Craft lab** | ||
+ | - Check kids markers in craft lab for dried out ones. See Kathy H. for further instructions | ||
+ | |||
+ | **General** | ||
+ | - Empty vacuum cleaners and clean the filter | ||
+ | - Clean table surfaces | ||
+ | - Sort screws in the screw bins by the metalshop | ||
+ | - Sort drill bits in the metal shop | ||
+ | - Coil up loose cables and hoses | ||
+ | - Use the push sweeper in the east and west room | ||
+ | - Replace paper towel rolls | ||
+ | - Place ryobi batteries in charger | ||
+ | - Collect measuring tapes from around the space and put them back in the bin to the left of the wood shop | ||
+ | - Check parking permits for expiration and write " | ||
+ | - Add parking tickets to obviously out-of-place items | ||
+ | - Move items/ | ||
+ | - Make sure the emergency phones are plugged in, charging, and operational | ||
==== Website ==== | ==== Website ==== | ||
Line 68: | Line 106: | ||
==== Outdoors ==== | ==== Outdoors ==== | ||
- Alley lights - Need volunteers, See Tom G. | - Alley lights - Need volunteers, See Tom G. | ||
+ | - Install Outdoor Lights on east side of building.(Mike T.) | ||
- Parking sign for Building - electronic (still desired? | - Parking sign for Building - electronic (still desired? | ||
- Finish the exterior south east entrance (vault hall). | - Finish the exterior south east entrance (vault hall). | ||
Line 81: | Line 120: | ||
- Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle. | - Re-stripe the exit aisles - add some diagonal stripes so people know what part is aisle. | ||
- Paint new brick work inside the vault hall | - Paint new brick work inside the vault hall | ||
- | - Replace steel floor plates covering holes, or Flatten and weld reinforcements on them so they won't bend if the forklift drives over them - Dan J. | ||
- | |||
==== Laser Lab ==== | ==== Laser Lab ==== | ||
Line 91: | Line 128: | ||
===== Completed Projects ===== | ===== Completed Projects ===== | ||
+ | - < | ||
+ | - < | ||
+ | - < | ||
- < | - < | ||
- < | - < |