User Tools

Site Tools


spaceprojs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
spaceprojs [2019/03/16 23:53]
kathughett
spaceprojs [2019/03/16 23:53]
kathughett
Line 16: Line 16:
   - Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus for instruction.   - Install the Milwaukee Tool fob cabinets in the metal Shop. See Markus for instruction.
   - Clean Up the New-To-the-Makerspace Grill   - Clean Up the New-To-the-Makerspace Grill
-  - Revamp the Cafe area floor and build a large rolling island with cabinets below for storage(See Kyle & Tom Gondek).+  - Revamp the Cafe area floor and build a large rolling island with cabinets below for storage(See Kyle)
   - Clean graffiti off of external East Wall.    - Clean graffiti off of external East Wall. 
   - Rearrange space in Machine shop to make room for the new Tormach.   - Rearrange space in Machine shop to make room for the new Tormach.
spaceprojs.txt · Last modified: 2022/12/16 18:12 by wildapricot-schultz_hannah