This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
spaceprojs [2019/01/28 17:24] wildapricot-schneider_markus [Punch List for January 2019] |
spaceprojs [2019/02/15 23:51] kathughett |
||
---|---|---|---|
Line 15: | Line 15: | ||
- Vacuum Cafe area at the end of the day after the feast. | - Vacuum Cafe area at the end of the day after the feast. | ||
- Red ticket abandoned projects in East Room. | - Red ticket abandoned projects in East Room. | ||
+ | - Remove fluorescent lights in vault hallway in spaces VA103 & VA104. (brought in by Matt Melk). | ||
+ | - Revamp the Cafe area floor and build a large rolling island with cabinets below for storage(See Kyle & Tom Gondek). | ||
- Install suspended electrical hookup above craft lab table. (Colleen and Markus) | - Install suspended electrical hookup above craft lab table. (Colleen and Markus) | ||
- Add 8 additional lights to the metal shop. They need to be wired in. See Tom K. for instructions. | - Add 8 additional lights to the metal shop. They need to be wired in. See Tom K. for instructions. | ||
- See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | - See if there are enough trash bags in the green supply cabinet by the men's room. If not enough, buy more now. | ||
- | - Disseminate contents of IMPOUND LOT. | ||
- Organize the paint room shelves. Dust off cans. | - Organize the paint room shelves. Dust off cans. | ||
- Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | - Inventory storage, find lapsed storage still in use (Ongoing for Facilities Director) | ||
Line 26: | Line 27: | ||
- Replace furnace filters if needed (and update the page [[miscellaneous: | - Replace furnace filters if needed (and update the page [[miscellaneous: | ||
- Replace wood shop air filters (ongoing) | - Replace wood shop air filters (ongoing) | ||
- | - Revamp the Cafe area and build a large rolling island with cabinets below for storage(See Kyle). | ||
- Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind. | - Craft Lab: - Organize scrap materials, throw away silly (e.g. tiny and/or unusable) pieces, Organize and evaluate supplies with Make-a-thon in mind. | ||
- Clean up Cosplay room. Clear path to server room door. | - Clean up Cosplay room. Clear path to server room door. | ||
+ | - Disseminate contents of IMPOUND LOT if needed. | ||
- Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first) | - Paint wall behind dining table in Lobby area. (Colleen & Kathy need to choose a paint color first) | ||
- | - Install additional lights in vault hallway. (brought in by Matt Melk).(Does anyone still feel that we need to do this?) | + | |
===== Standing To-Do/ | ===== Standing To-Do/ |