These are projects that need to be done around the space for the benefit of the space. If you want to help out on a project dig right in, if you need guidance ask Tom Gralewicz, if you want help with a project post to the group and see who wants to help.

Once you start working on a project put your name after it. Once you finish a project move it down to the finished list so people know who to thank.

Projects to do:

  • Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. Check with Tom Gralewicz for positioning. We have the tools and bolts at the space.
  • Mount the curb blocks - drill some holes and pound rods to keep the curb blocks from moving.
  • Replace the light socket on the vertical band saw.
  • Fix the 25W laser - find out if its the tube or the power supply.
  • SMD rack - make a new rack to hold the SMD component reels, label the strips coming out and capture them so they don't unreel.
  • Install the doors with windows: 2 in the south wall of the electronics lab and one between the east room and vestibule.
  • Build the chem lab floor - it needs a raised floor so we can run drains and put a sink anywhere in the room and a sink in the dark room
  • Install a sink in the chem lab
  • Install a sink in the dark room
  • Paint exterior door frames where the new doors were installed. Caulk when done.
  • Finish the exterior south east entrance (vault hall). The ceiling panels door need to be caulked and painted.
  • Power the dust collector in the wood shop - Tom Gralewicz
  • Remove the old heater above the back hall from the craft shop so we can hang new lights
  • Hang new lights in the craft shop hall.
  • Move the exhaust fan for the laser cutters and duct it.
  • Alley lights
  • Pin ball machine repairs, a never ending project: replace broken flipper.
  • Wash the carpet - try to get out some of the water stains.
  • Switch plate next to the Otjen entrance
  • PA system/phones - Chris H.
  • Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router.
  • Get an ice maker working in one of the refrigerators (kegerator has one)
  • Permanent charging station for the fork lift.
  • Outlets on the columns in the East room
  • East and West room lighting automation system - Vishal
  • Stripe the exit aisles - add some diagonal stripes so people know what part is aisle.
  • Duct part of the vent fan in the chem lab to above the spray nook.
  • Access control system at Vault entrance - Royce P.
  • Paint new brick work inside the vault hall
  • Paint new brick work outside the building
  • Repair broken bricks around the outside of the building.
  • Come up with scrap metal bins to hold small pieces so they don't spill everywhere.
  • Power up the 3 headed drill press (with only 2 heads left.
  • Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws.
  • Tool pegboard - make something to hold pliers and Allen keys better.
  • Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard.
  • Hang speakers and wire sound system - Kevin B.
  • Replace steel floor plates with holes in the and reinforce them so they won't bend if the fork lift drives over them.
  • Gas line for the forge and furnace.
  • Mount a good grinder in the welding are for sharpening TIG electrodes.
  • Fix the louvers on the weld shop fan so they close correctly.
  • Do something with the VLAT.

Projects Done:

  • Install Air Lines - Joe R. and Chris H.