Line 17: Line 17:
   * Paint exterior door frames where the new doors were installed.  Caulk when done.   * Paint exterior door frames where the new doors were installed.  Caulk when done.
   * Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted.   * Finish the exterior south east entrance (vault hall).  The ceiling panels door need to be caulked and painted.
-  * Power the dust collector in the wood shop -  Tom Gralewicz 
   * Remove the old heater above the back hall from the craft shop so we can hang new lights   * Remove the old heater above the back hall from the craft shop so we can hang new lights
   * Hang new lights in the craft shop hall.   * Hang new lights in the craft shop hall.
Line 52: Line 51:
 Projects Done: Projects Done:
   * Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard.   * Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard.
 +  * Power the dust collector in the wood shop -  Tom G
   * Install Air Lines - Joe R. and Chris H.   * Install Air Lines - Joe R. and Chris H.