-These are projects that need to be done around the space for the benfit of the space. +These are projects that need to be done around the space for the benefit of the space. 
-If you want to help out on a project dig right in, if you need guidence ask Tom Gralewicz, if you want help with a project post to the group and see who wants to help.+If you want to help out on a project dig right in, if you need guidance ask Tom Gralewicz, if you want help with a project post to the group and see who wants to help.
  
 Once you start working on a project put your name after it.  Once you finish a project move it down to the finished list so people know who to thank. Once you start working on a project put your name after it.  Once you finish a project move it down to the finished list so people know who to thank.
 +
 +Projects to do:
  
   * Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far.  Check with Tom Gralewicz for positioning.  We have the tools and bolts at the space.   * Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far.  Check with Tom Gralewicz for positioning.  We have the tools and bolts at the space.
Line 18: Line 20:
   * Remove the old heater above the back hall from the craft shop so we can hang new lights   * Remove the old heater above the back hall from the craft shop so we can hang new lights
   * Hang new lights in the craft shop hall.   * Hang new lights in the craft shop hall.
-  * +  * Move the exhaust fan for the laser cutters and duct it. 
 +  * Alley lights 
 +  * Pin ball machine repairs, a never ending project:  replace broken flipper. 
 +  * Wash the carpet - try to get out some of the water stains. 
 +  * Switch plate next to the Otjen entrance 
 +  * PA system/phones - Chris H. 
 +  * Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router. 
 +  * Get an ice maker working in one of the refrigerators (kegerator has one) 
 +  * Permanent charging station for the fork lift. 
 +  * Outlets on the columns in the East room 
 +  * East and West room lighting automation system - Vishal 
 +  * Stripe the exit aisles - add some diagonal stripes so people know what part is aisle. 
 +  * Duct part of the vent fan in the chem lab to above the spray nook. 
 +  * Access control system at Vault entrance - Royce P. 
 +  * Paint new brick work inside the vault hall 
 +  * Paint new brick work outside the building 
 +  * Repair broken bricks around the outside of the building. 
 +  * Come up with scrap metal bins to hold small pieces so they don't spill everywhere. 
 +  * Power up the 3 headed drill press (with only 2 heads left. 
 +  * Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws. 
 +  * Tool pegboard - make something to hold pliers and Allen keys better. 
 +  * Hang speakers and wire sound system - Kevin B. 
 +  * Replace steel floor plates with holes in the and reinforce them so they won't bend if the fork lift drives over them. 
 +  * Gas line for the forge and furnace. 
 +  * Mount a good grinder in the welding are for sharpening TIG electrodes. 
 +  * Fix the louvers on the weld shop fan so they close correctly. 
 +  * Do something with the VLAT. 
 + 
  
 +Projects Done:
 +  * Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard.
 +  * Install Air Lines - Joe R. and Chris H.