soaceprojs [2013/08/23 04:34] gralewicz created |
soaceprojs [2013/10/11 23:20] branth |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | These are projects that need to be done around the space for the benfit | + | These are projects that need to be done around the space for the benefit |
- | If you want to help out on a project dig right in, if you need guidence | + | If you want to help out on a project dig right in, if you need guidance |
Once you start working on a project put your name after it. Once you finish a project move it down to the finished list so people know who to thank. | Once you start working on a project put your name after it. Once you finish a project move it down to the finished list so people know who to thank. | ||
+ | |||
+ | Projects to do: | ||
* Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. Check with Tom Gralewicz for positioning. | * Door stop bollards - mount the big yellow posts to keep the alley doors from swinging too far. Check with Tom Gralewicz for positioning. | ||
Line 18: | Line 20: | ||
* Remove the old heater above the back hall from the craft shop so we can hang new lights | * Remove the old heater above the back hall from the craft shop so we can hang new lights | ||
* Hang new lights in the craft shop hall. | * Hang new lights in the craft shop hall. | ||
- | * | + | * Move the exhaust fan for the laser cutters and duct it. |
+ | * Alley lights | ||
+ | * Pin ball machine repairs, a never ending project: | ||
+ | * Wash the carpet - try to get out some of the water stains. | ||
+ | * Switch plate next to the Otjen entrance | ||
+ | * PA system/ | ||
+ | * Swap out the computers in the Laser cutter room for the dual core machines next to the mini CNC router. | ||
+ | * Get an ice maker working in one of the refrigerators (kegerator has one) | ||
+ | * Permanent charging station for the fork lift. | ||
+ | * Outlets on the columns in the East room | ||
+ | * East and West room lighting automation system - Vishal | ||
+ | * Stripe the exit aisles - add some diagonal stripes so people know what part is aisle. | ||
+ | * Duct part of the vent fan in the chem lab to above the spray nook. | ||
+ | * Access control system at Vault entrance - Royce P. | ||
+ | * Paint new brick work inside the vault hall | ||
+ | * Paint new brick work outside the building | ||
+ | * Repair broken bricks around the outside of the building. | ||
+ | * Come up with scrap metal bins to hold small pieces so they don't spill everywhere. | ||
+ | * Power up the 3 headed drill press (with only 2 heads left. | ||
+ | * Find/make chuck jaws for the Logan lathe, or mount a chuck that has both sets of jaws. | ||
+ | * Tool pegboard - make something to hold pliers and Allen keys better. | ||
+ | * Hang speakers and wire sound system - Kevin B. | ||
+ | * Replace steel floor plates with holes in the and reinforce them so they won't bend if the fork lift drives over them. | ||
+ | * Gas line for the forge and furnace. | ||
+ | * Mount a good grinder in the welding are for sharpening TIG electrodes. | ||
+ | * Fix the louvers on the weld shop fan so they close correctly. | ||
+ | * Do something with the VLAT. | ||
+ | |||
+ | Projects Done: | ||
+ | * Add more tool pegboard in the wood shop and move wood shop tools and half of the duplicate tools from the main pegboard. | ||
+ | * Install Air Lines - Joe R. and Chris H. |