First considered several months prior, discussed multiple times, but finally done on 4/28/13. From start to finish in about 90 minutes. The shelves are installed at a 70 degree angle and cutting them on the table saw was tricky. Props to Kevin C for the help.
Now mounted in the East Room by the door to the lobby.