This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
projects:longstockstoragerack [2015/05/31 16:20] branth [Long Stock Storage Rack] |
projects:longstockstoragerack [2015/06/21 06:06] branth |
||
---|---|---|---|
Line 2: | Line 2: | ||
{{: | {{: | ||
- | |||
- | ===== Summary Status ===== | ||
- | |||
- | * Needs the upper platform and framing installed | ||
- | * Needs to be moved to the final location | ||
- | * Needs conduits/ | ||
Line 13: | Line 7: | ||
Storage for sheet materials, 4' | Storage for sheet materials, 4' | ||
- | ===== Bill of Materials | + | ===== Contributors |
- | ^ Part Desc ^ Vendor ^ Part Nbr ^ Qty ^ Unit Cost ^ Total Cost ^ | + | * [[members: |
- | | Part 1 | Vendor 1 | Nbr 1 | Q1 | $0.00 | $0.00 | | + | * [[members: |
+ | * [[members: | ||
+ | * [[members: | ||
+ | * [[members: | ||
- | ===== Project Tasks ===== | + | ===== History |
- | ^ Task ^ Status ^ | + | * 2014-10-28 - Mentioned at a Tuesday Meeting |
- | | Design | Done | | + | * 2014-11-20 - BOD discussion, plans |
- | | Acquire materials | Done | | + | * 2015-01-15 - Lance shared a 3-D model he sketched up at BOD Meeting |
- | | Build frame | In progress | | + | * 2015-01-23 - BOD votes to fund it, $200-250 |
- | | Install dividers | In progress | | + | * 2015-02-?? - Materials bought |
- | | Brace framing | In progress | | + | * 2015-04-26 - Construction begins |
- | | Move to final location | In progress | | + | * 2015-06-07 - ShaneT and Brant worked on the top platform and uprights |
+ | * 2015-06-20 - Added more upright conduits | ||
- | ===== Makerspace Members ===== | ||
- | * [[members: | ||
- | * [[members: | ||
- | * [[members: | ||
- | * [[members: |