Item #005 - Subterranean Exploration Project

Photographs

Description

  • Several small tunnels/conduits exist below/within the foundation of the building
  • Original floor plans indicate tunnels were used for electrical wiring and refrigerant lines for grocery store equipment
  • Average inside diameter of tunnels varies between 10“ to 14”

Status

  • Design of ROV in progress

History

  • Planning began late 2013