This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
miscellaneous:organization [2012/01/31 23:00] kevinb |
miscellaneous:organization [2013/02/03 17:28] (current) branth [Things To Do During Every Makerspace Reorganization Day] |
||
---|---|---|---|
Line 9: | Line 9: | ||
Indicate on the main line if the item has been taken care of. | Indicate on the main line if the item has been taken care of. | ||
+ | |||
+ | **NOTE:\\ | ||
+ | THIS PAGE IS KINDA, SORTA OUT OF DATE\\ | ||
+ | PLEASE REFER TO [[miscellaneous: | ||
+ | |||
+ | -------\\ | ||
+ | |||
+ | ====== Things To Do During Every Makerspace Reorganization Day ====== | ||
+ | |||
+ | * Rounding tools up from everywhere and putting the away | ||
+ | * Sweep everywhere | ||
+ | * Take out the trash | ||
+ | * Throw away trash from all the horizontal surfaces | ||
+ | * Clean up the bay (sweeping and moving things back into their squares, etc) | ||
+ | * Put any newly acquired electronics components into the electronics bins | ||
+ | * Cleaning up the Woodshop | ||
+ | * Organizing the lumber stock - throwing out all the odd scraps | ||
+ | * Labeling / reorganizing more drawers in the screw/bolt collection | ||
+ | |||
+ | |||
+ | |||
====== Things to Build / Organize / Reorganize At The Makerspace ====== | ====== Things to Build / Organize / Reorganize At The Makerspace ====== | ||
* Have a Workbench building party - to replace the work surfaces lost during our last reorganization (Kevin) | * Have a Workbench building party - to replace the work surfaces lost during our last reorganization (Kevin) | ||
- | * 1-31-2012 | ||
- | * Build Smaller (2' x 6'?) tables for the Lab (Kevin) | ||
- | * 1-31-2012 | ||
- | * Build a whisky shot glass organizer to hang on the wall in the lab (Everyone) | ||
- | * 1-31-2012 | ||
- | * Cut and reweld one pallet rack brace to finish the new pallet racking (Kevin) | ||
* 1-31-2012 | * 1-31-2012 | ||
* Add lighting over the hardware drawers (Kevin) | * Add lighting over the hardware drawers (Kevin) | ||
- | * 1-31-2012 | ||
- | * Finish reorganizing the power tools and cordless tool recharging area (Kevin) | ||
* 1-31-2012 | * 1-31-2012 | ||
* Get rid of some of the 4.5 drill presses we have (Kevin) | * Get rid of some of the 4.5 drill presses we have (Kevin) | ||
Line 32: | Line 45: | ||
* Label the screw/bolt collection drawers (Kevin) | * Label the screw/bolt collection drawers (Kevin) | ||
* 1-31-2012 | * 1-31-2012 | ||
- | * Label all the member pallets | + | * Finish reorganizing |
- | * 1-31-2012 | + | |
+ | * " | ||
+ | * 2-03-2012 | ||
+ | * Build a whisky shot glass organizer to hang on the wall in the lab (Everyone) | ||
+ | * 2-03-2012 | ||
+ | * Remove all the excess dirt and filth from the building (Everyone) | ||
+ | * 2012-02-24 | ||
+ | * Putting in a new countertop in the lab | ||
+ | * 2012-06-30 | ||
* Add your ideas here | * Add your ideas here | ||
- | | + | |
+ | ====== Completed ====== | ||
+ | |||
+ | * Build Smaller (2' x 6'?) tables for the Lab (Kevin) | ||
+ | * 1-31-2012 | ||
+ | * Sort of Completed by removing one table | ||
+ | * Cut and reweld one pallet rack brace to finish the new pallet racking (Kevin) | ||
+ | * 1-31-2012 | ||
+ | * Completed by Rich on 2-21-2012 |