Paint and Chemical Vault
Rules and Etiquette
Use parking passes to tag any projects you are leaving to dry
Write notes on dry erase board at your discretion
Turn on lights and fans when using the room
Contact BrantH. if you have any questions
Equipment
2018 Expansion
In March of 2018 the vault next to the Paint Room (Vault #15) was vacant and an opportunity arose to double the size of the current space.
A meeting was held on Wednesday, 4/25/18 to discuss proposals and ideas. 14 people attended:
Brant H.
Tim C.
Lyra C.
Tony S.
Kathy C.
Tony W.
Tom Grz.
Morgan K.W.
Jake B.
Hiram W.
Harvey M.
Steve P.
Kathy H.
Bill C.
Scope
Budget
Estimated total cost = $373
Metal framing (approx. 87 lineal ft.)
(4) 10 ft. verticals = 40 ft.
(6) 5.4 ft. kickers = 32.3 ft.
(2) 6-7 ft. base/top plates = 14 ft.
Home Depot $3.59/8 ft. length
-
Total likely $43 w/ tax
Roll filter media (approx. 60 sq.ft.)
(2) Wide flange steel channels
Harrison Metals gave Tom metal for free
MetalsDepot, 8” tall, 2.5“ wide 72” long, A-36 Steel Channel, $156 ea.
Schedule/Phasing
Date TBD - Provide proposal to Board for review
Date TBD - Obtain Board approval to proceed
Date TBD - Clear out Vault 15 and remove remaining wood shelf parts from wall
Date TBD - Relocate shelving and paints from Vault 16 to 15
Date TBD - Cut new air grille into Vault 15 door
Date TBD - Relocate air hose and regulator out from under wall fan in Vault 16
Date TBD - Remove existing filter and framing from sidewall fan in Vault 16
Date TBD - Build diagonal metal frame filter wall at sidewall fan in Vault 16
Date TBD - Install blanking panel(s) or baffles at fan
Date TBD - Cover filter wall with wire mesh and roll filter mesh
Date TBD - Saw cut opening in wall between vaults
Date TBD - Install temporary jack posts for spancrete ceilings?
Date TBD - Demolish 1/2 depth portion above opening for new lintel/steel channels
Date TBD - Install first lintel/steel channel
Date TBD - Demolish remaining 1/2 depth portion on other side of wall
Date TBD - Install second lintel/steel channel and secure channels together
Date TBD - Demolish block from new opening
Date TBD - Clean/deburr inside edges of new opening
Date TBD - Complete relocation of tables/equipment as needed