How to Glaze

Safety

Glazing Prep

  1. If your piece is dirty, you need to wash it. Dust and oil will affect glaze adhesion.
  2. If you want to apply Wax or tape, this is the time to do so.
  3. Double bucket wash system. 1 bucket is for “clean” water, the 2nd is for “dirty” water when wiping down glaze spills or wiping off the bottom of the piece.
  4. Mixing glazes
    • chose the appropriate glaze mixing stick for each bucket, Small vs Large,
    • drill speed set to 1 (1 or 2 speed adjustment on top of drill), mud mixer set to max
    • mix for at least 3 minutes
    • check consistency for chunks or unincorporated materials.
    • if something “feels” wrong, chances are there is something wrong.

Methods of application

Dip
Brush
Pour
Spray

Currently Unavailable

Cleanup