This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
miscellaneous:lenoxtodo [2013/07/22 21:15] raster [Screen printing area / printing area - 20% done] |
miscellaneous:lenoxtodo [2013/10/12 16:01] (current) branth |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
+ | [[: | ||
===== Warm Weather Projects===== | ===== Warm Weather Projects===== | ||
Line 6: | Line 7: | ||
(In no particular order) | (In no particular order) | ||
- | -Striping the parking area | + | -<del>Striping the parking area</ |
-Lighting in the alley | -Lighting in the alley | ||
-Paint metal door frames | -Paint metal door frames | ||
Line 13: | Line 14: | ||
-Mortar in the brick that fills the hole outside the south door where a light switch was removed | -Mortar in the brick that fills the hole outside the south door where a light switch was removed | ||
-Rooftop solar | -Rooftop solar | ||
- | -Rain barrel | + | -<del>Rain barrel</ |
-landscaping? | -landscaping? | ||
-tuck point and repair brick around the building | -tuck point and repair brick around the building | ||
Line 96: | Line 97: | ||
- How will we get water there, and who will do it? | - How will we get water there, and who will do it? | ||
==== Wood shop - 90% done ==== | ==== Wood shop - 90% done ==== | ||
- | * Owner: Tom Gondek | + | * Owner: Tom Gondek (previously MattN) |
* Participants: | * Participants: | ||
* Projects: | * Projects: | ||
Line 127: | Line 128: | ||
- < | - < | ||
- Workbenches - build them! | - Workbenches - build them! | ||
- | ==== Welding Area - 40% done ==== | + | ==== Welding Area - 60% done ==== |
- | * Owner: Matt W. | + | * Owner: Matt W. / Dan J. |
* Participants: | * Participants: | ||
* Projects: | * Projects: | ||
- | - Set up space for casting/ | + | |
+ | - Build Auxiliary hammer / forging tool rack. | ||
+ | - Build shelving for mold boxes. | ||
+ | - Mount small forge in permanent home. | ||
+ | - Build door system for large forge - almost done. | ||
+ | - <del>Set up space for casting/ | ||
+ | - < | ||
+ | - < | ||
- < | - < | ||
- < | - < | ||
Line 158: | Line 166: | ||
==== 3D printer Area - 90% done ==== | ==== 3D printer Area - 90% done ==== | ||
* Owner: Joseph and ? | * Owner: Joseph and ? | ||
- | * Participants: | + | * Participants: |
* Projects: | * Projects: | ||
- < | - < | ||
Line 203: | Line 211: | ||
==== Classroom - 20% done ==== | ==== Classroom - 20% done ==== | ||
* Owner: ??? | * Owner: ??? | ||
- | * Participants: | + | * Participants: |
* Projects: | * Projects: | ||
- Permanently setup Google hangout infrastructure | - Permanently setup Google hangout infrastructure | ||
Line 213: | Line 221: | ||
- Set up the Library - for O' | - Set up the Library - for O' | ||
==== Meeting Room - 76% done ==== | ==== Meeting Room - 76% done ==== | ||
- | * Owner: | + | * Owner: |
- | * Participants - PeteP, BrantH, KevinC | + | * Participants - [[members: |
- Table | - Table | ||
- KevinC is building legs/bases. | - KevinC is building legs/bases. | ||
Line 221: | Line 229: | ||
- Long HDMI cable leads to front of room next to screen. | - Long HDMI cable leads to front of room next to screen. | ||
- Podium is in place, but needs more work (Pete) | - Podium is in place, but needs more work (Pete) | ||
- | - Add ability to dim just the lights in from of the screen (Can Vishal help with that?) | + | - Add ability to dim just the lights in front of the screen (Can Vishal help with that?) |
Line 229: | Line 237: | ||
==== Photo and Video Area - 20% done ==== | ==== Photo and Video Area - 20% done ==== | ||
* Owner: ??? | * Owner: ??? | ||
- | * Participants: | + | * Participants: |
* Projects: | * Projects: | ||
- < | - < | ||
Line 240: | Line 248: | ||
- < | - < | ||
==== Storage Areas - 42% done ==== | ==== Storage Areas - 42% done ==== | ||
- | * Owner: | + | * Owner: |
* Participants: | * Participants: | ||
* Projects: | * Projects: | ||
Line 251: | Line 259: | ||
- Could include squares that have been built up into cubicle-like rental spaces | - Could include squares that have been built up into cubicle-like rental spaces | ||
==== Dark Room - 10% done ==== | ==== Dark Room - 10% done ==== | ||
- | * Owner: Brent/ | + | * Owner: Brent/ |
- | * Participants: | + | * Participants: |
* Projects: | * Projects: | ||
- Dark room/light tight area for various light-sensitive processes. | - Dark room/light tight area for various light-sensitive processes. | ||
Line 264: | Line 272: | ||
- Sand blasting area | - Sand blasting area | ||
- Spray booth for painting (Tim Gr. has one.) | - Spray booth for painting (Tim Gr. has one.) | ||
- | - Powder coating lab (Pete has a powder coating gun, needs oven.) | + | - Powder coating lab |
- Anodizing lab | - Anodizing lab | ||
- Metal plating area | - Metal plating area | ||
Line 314: | Line 322: | ||
* This should be right up front - in the entry way | * This should be right up front - in the entry way | ||
* Post articles and newspaper clippings on walls | * Post articles and newspaper clippings on walls | ||
- | * Post member photos (In progress!) | + | * Post member photos (In progress!) |
==== Payment drop box - DONE ==== | ==== Payment drop box - DONE ==== | ||
* Owner: N/A | * Owner: N/A | ||
Line 324: | Line 332: | ||
* Participants: | * Participants: | ||
* Projects: | * Projects: | ||
- | * Set up the Silk screen Press area (It's in the vault hallway) | + | * Set up the Silk Screen Area (It's in the vault hallway) |
* Gather up squeegees | * Gather up squeegees | ||
* Gather up blank screens | * Gather up blank screens |