Table of Contents

ABANDONED! PLEASE GO HERE:

Space Projects/To-Do

Warm Weather Projects

Things we should do before winter

(In no particular order)

  1. Striping the parking area
  2. Lighting in the alley
  3. Paint metal door frames
  4. outdoor signage (requires city approval– the sooner we can put together a proposal, the more time we'll have to actually work on it before winter)
  5. Awning or gutter above north door (lack of same caused severe rusting to previous door & frame)
  6. Mortar in the brick that fills the hole outside the south door where a light switch was removed
  7. Rooftop solar
  8. Rain barrel Determined to be useless. Rain Garden instead?
  9. landscaping?
  10. tuck point and repair brick around the building
  11. Covers inside the ventilation fans to minimize leakage in winter (open when in use)
  12. Weatherstripping on the bottom of outside doors

Things anyone can help with

  1. Repair/add locks to restroom stall doors
  2. Make and post shop rules/safety signs
    1. See SeanM's suggestions shared via Google Drive
  3. Make and post group policy signs (EricB said he'd cut some vinyl and/or design some)
    1. Big Pallet racking sign
      1. Storage for full time, student, and ? members only
      2. 1 pallet per member Label your pallet
      3. It must fit on the rack and not interfere with adjacent pallets
    2. Big part-time member shelving sign
      1. Part time member storage 1 shelf per member
      2. Label your shelf!
      3. Don't let anything stick out the front or sides of your shelf
    3. Big workshop signs
      1. Don't use equipment you aren't checked out on
      2. Clean up before you go home
      3. If you leave a project out, label it with a parking pass (passes are kept xxx)
      4. Don't bring any new equipment for the space until it has been approved by the Board of Directors
      5. Raw material kept in this room is available for any one's use - unless it has someones name on it
    4. Member Storage Area signs
      1. Material stored here belongs to members and is not available for hacking
      2. Members, label your areas and keep you stuff inside your allotted space
      3. Any member who wants to rent storage space please contact the Board of Directors
  4. Add bin or mailbox for blank parking permits/tickets
    1. Post in workshops, near doors
    2. Maybe include markers/pens
    3. Tie yarn/string to markers/pens so they don't wander off

Administrative Tasks

  1. Data entry - Type up visitor email addresses from Sustainability Summit sign-up lists
    1. ShaneT offered to do
  2. Update member agreement to remove commercial activity 5% donation clause
  3. Replace cam lock on Drop Box so we have two keys
  4. Guest Liability waivers
    1. KevinB said he'd come up with an 11×17 binder or something, see 3/7 Board Mtg Notes
    2. JasonG suggested a computer terminal with thermal printer paper be set up (on member's only list)
  5. Continue identifying tools/equipment
    1. Complete training forms, leasing forms, add numbered stickers, etc.
    2. What to do if no one claims ownership of something?
    3. Review our liability policy and determine equipment leasing
  6. Continue discussion on installing CCTV/DVR security cameras
  7. Designate a temporary project storage workspace in east room (after Art Jam)
  8. Designate areas for MMS raw material storage
  9. Continue discussion on kids in the Space
    1. How to resolve safety and liability issues
    2. Planning events specific for kids i.e. Maker Scouts, Big Brothers/Big Sisters
    3. Limiting access to parts of the building

Lenox Project To Do List By Area

Currently Planned Spaces

Network Infrastructure - 100% done

Chemical Storage / Fume Hood / Etching lab - 10% done

Wood shop - 90% done

Metal Shop - 70% done

Welding Area - 60% done

Audio System - 10% done

Laser Cutter Room - 70% complete

3D printer Area - 90% done

Chill Out Area - 18% done

Electronics Area - 80% done

Craft Lab - 50% done

Classroom - 20% done

Meeting Room - 76% done

Photo and Video Area - 20% done

Storage Areas - 42% done

Dark Room - 10% done

Metal finishing area - 0% done

Bathrooms - 33% done

Building signage/wayfinding - 80% done

Many More Areas

Updates to Webpage

Finished Project Gallery / Trophy Case / Wall of Fame - 10% done

Payment drop box - DONE

Screen Printing Area - 70% done

Other Possible spaces

Stretch Goals